Assessing the Impact of Requests for Information in Electrical and Instrumentation Engineering Contracts
Using a case study, errors, omissions and information redundancy contained in the electrical and instrumentation (E&I) ‘As-built’drawings for a Stacker Conveyor were examined.Atotal of 449 errors and omissions were identified within 42 documents. In addition, 231 cables and components appeared o...
| Main Authors: | , , , |
|---|---|
| Format: | Journal Article |
| Published: |
Taylor & Francis
2014
|
| Online Access: | http://hdl.handle.net/20.500.11937/39483 |