Probability distribution fitting of schedule overruns in construction projects

The probability of schedule overruns for construction and engineering projects can be ascertained using a ‘best fit’ probability distribution from an empirical distribution. The statistical characteristics of schedule overruns occurring in 276 Australian construction and engineering projects were an...

Full description

Bibliographic Details
Main Authors: Love, Peter, Sing, Michael, Wang, Xiangyu, Edwards, David, Odeyinka, Henry
Format: Journal Article
Published: Palgrave MacMillan 2013
Subjects:
Online Access:http://hdl.handle.net/20.500.11937/38408
_version_ 1848755312899653632
author Love, Peter
Sing, Michael
Wang, Xiangyu
Edwards, David
Odeyinka, Henry
author_facet Love, Peter
Sing, Michael
Wang, Xiangyu
Edwards, David
Odeyinka, Henry
author_sort Love, Peter
building Curtin Institutional Repository
collection Online Access
description The probability of schedule overruns for construction and engineering projects can be ascertained using a ‘best fit’ probability distribution from an empirical distribution. The statistical characteristics of schedule overruns occurring in 276 Australian construction and engineering projects were analysed. Skewness and kurtosis values revealed that schedule overruns are non-Gaussian. Theoretical probability distributions were then fitted to the schedule overrun data; including the Kolmogorov–Smirnov, Anderson–Darling and Chi-Squared non-parametric tests to determine the ‘Goodness of Fit’. A Four Parameter Burr probability function best described the behaviour of schedule overruns, provided the best overall distribution fit and was used to calculate the probability of a schedule overrun being experienced. The statistical characteristics of contract size and schedule overruns were also analysed, and the Wakeby (<AU$1 m and AU$11–50 m), Three Parameter Log-logistic (AU$1–A$10 m) and Beta (AU$51–A$100 m and >AU$101 m) models provided the best distribution fits and were used to calculate schedule overrun probabilities by contract size.
first_indexed 2025-11-14T08:54:19Z
format Journal Article
id curtin-20.500.11937-38408
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T08:54:19Z
publishDate 2013
publisher Palgrave MacMillan
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-384082017-09-13T14:10:55Z Probability distribution fitting of schedule overruns in construction projects Love, Peter Sing, Michael Wang, Xiangyu Edwards, David Odeyinka, Henry distribution fitting schedule overrun probability Australia probability distribution The probability of schedule overruns for construction and engineering projects can be ascertained using a ‘best fit’ probability distribution from an empirical distribution. The statistical characteristics of schedule overruns occurring in 276 Australian construction and engineering projects were analysed. Skewness and kurtosis values revealed that schedule overruns are non-Gaussian. Theoretical probability distributions were then fitted to the schedule overrun data; including the Kolmogorov–Smirnov, Anderson–Darling and Chi-Squared non-parametric tests to determine the ‘Goodness of Fit’. A Four Parameter Burr probability function best described the behaviour of schedule overruns, provided the best overall distribution fit and was used to calculate the probability of a schedule overrun being experienced. The statistical characteristics of contract size and schedule overruns were also analysed, and the Wakeby (<AU$1 m and AU$11–50 m), Three Parameter Log-logistic (AU$1–A$10 m) and Beta (AU$51–A$100 m and >AU$101 m) models provided the best distribution fits and were used to calculate schedule overrun probabilities by contract size. 2013 Journal Article http://hdl.handle.net/20.500.11937/38408 10.1057/jors.2013.29 Palgrave MacMillan restricted
spellingShingle distribution fitting
schedule overrun
probability
Australia
probability distribution
Love, Peter
Sing, Michael
Wang, Xiangyu
Edwards, David
Odeyinka, Henry
Probability distribution fitting of schedule overruns in construction projects
title Probability distribution fitting of schedule overruns in construction projects
title_full Probability distribution fitting of schedule overruns in construction projects
title_fullStr Probability distribution fitting of schedule overruns in construction projects
title_full_unstemmed Probability distribution fitting of schedule overruns in construction projects
title_short Probability distribution fitting of schedule overruns in construction projects
title_sort probability distribution fitting of schedule overruns in construction projects
topic distribution fitting
schedule overrun
probability
Australia
probability distribution
url http://hdl.handle.net/20.500.11937/38408