Probability distribution fitting of schedule overruns in construction projects

The probability of schedule overruns for construction and engineering projects can be ascertained using a ‘best fit’ probability distribution from an empirical distribution. The statistical characteristics of schedule overruns occurring in 276 Australian construction and engineering projects were an...

Full description

Bibliographic Details
Main Authors: Love, Peter, Sing, Michael, Wang, Xiangyu, Edwards, David, Odeyinka, Henry
Format: Journal Article
Published: Palgrave MacMillan 2013
Subjects:
Online Access:http://hdl.handle.net/20.500.11937/38408