Disconnection time and sequence of rooftop PVs under short-circuit faults in low voltage networks
This paper presents an analysis on the disconnection time of single-phase rooftop PVs, located in a three-phase four-wire low voltage distribution feeder after a line-to-ground short-circuit fault on the low voltage feeder. The paper aims to evaluate and discuss the disconnection time and sequence o...
| Main Authors: | , , |
|---|---|
| Format: | Conference Paper |
| Published: |
2015
|
| Online Access: | http://hdl.handle.net/20.500.11937/38144 |