Exploiting the metallurgical throughput–recovery relationship to optimise resource value as part of the production scheduling process

A single process plant throughput rate to achieve a certain recovery at a certain cost is often assumed over the life of a resource project for strategic planning purposes. The process plant throughput–recovery relationship that exists for each ore type can and should be exploited for the purpose of...

Full description

Bibliographic Details
Main Authors: Yap, A., Saconi, F., Nehring, M., Arteaga, F., Pinto, P., Asad, Mohammad Waqar, Ozhigin, S., Ozhigina, S., Mozer, D., Nagibin, A., Pul, E., Shvedov, D., Ozhigin, D., Gorokhov, D., Karatayeva, V.
Format: Journal Article
Published: Elsevier 2013
Subjects:
Online Access:http://hdl.handle.net/20.500.11937/36309