The Effectiveness of Vibration Reduction Trenches in a Dynamic Replacement Project
Umm Al Quwain Marina Phase I Project is located in northern United Arab Emirates. The site is located in an area where the ground consists of 6 to 7 m of very loose heterogeneous saturated silt and silty sand. More than 86,000 m2 of the site has been treated using dynamic replacement. Due to the pre...
| Main Authors: | , , |
|---|---|
| Other Authors: | |
| Format: | Conference Paper |
| Published: |
The Australian Geomechanical Society and New Zealand Geotechnical Society
2012
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/20.500.11937/25182 |