Cut-off Grades and Optimising the Strategic Mine Plan
| Main Author: | Hall, Brian |
|---|---|
| Format: | Book |
| Published: |
Australasian Institute of Mining and Metallurgy
2014
|
| Online Access: | http://hdl.handle.net/20.500.11937/24711 |
Similar Items
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016)
by: Asad, Mohammad, et al.
Published: (2016)
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019)
by: Khan, A., et al.
Published: (2019)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
by: Qureshi, Muhammad Asim
Published: (2017)
by: Qureshi, Muhammad Asim
Published: (2017)
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018)
by: Khan, A., et al.
Published: (2018)
Optimised decision-making under grade uncertainty in surface mining
by: Grobler, Francois
Published: (2015)
by: Grobler, Francois
Published: (2015)
Off Cuts
by: Kovacsy, Benjamin
Published: (2011)
by: Kovacsy, Benjamin
Published: (2011)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Global mining schools-poised for strategic growth
by: Hall, Stephen
Published: (2011)
by: Hall, Stephen
Published: (2011)
Optimisation Models for Medium-Long Term Logistics Planning in Mining
by: Phangestu, Jimmi
Published: (2017)
by: Phangestu, Jimmi
Published: (2017)
Risk-based decision making within strategic mine planning
by: Maybee, Bryan, et al.
Published: (2010)
by: Maybee, Bryan, et al.
Published: (2010)
Central kuching flooded, serian road cut off
by: The Borneo Post, -
Published: (2016)
by: The Borneo Post, -
Published: (2016)
Strategic mine planning model using network flow model and real case application
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Is 45 years-of-age the cut-off for using autologous oocytes?
by: Yovich, John, et al.
Published: (2018)
by: Yovich, John, et al.
Published: (2018)
The optimisation rule for investment in mining projects
by: Foo, N., et al.
Published: (2017)
by: Foo, N., et al.
Published: (2017)
Grade Uncertainty and its Impact on Ore Grade Reconciliation between the Resource Model and the Mine
by: Parhizkar, A., et al.
Published: (2011)
by: Parhizkar, A., et al.
Published: (2011)
Develpoment of combinatorial optimisation for cutting tool path strategy
by: Alsultaney, Hazem K., et al.
Published: (2009)
by: Alsultaney, Hazem K., et al.
Published: (2009)
Scenario evaluation through Mine Schedule Optimisation
by: Fava, L., et al.
Published: (2011)
by: Fava, L., et al.
Published: (2011)
An optimisation approach to materials handling in surface mines
by: Burt, Christina Naomi
Published: (2008)
by: Burt, Christina Naomi
Published: (2008)
WCDMA Network Planning and Optimisation
by: Yeo, K., et al.
Published: (2008)
by: Yeo, K., et al.
Published: (2008)
Cut-off solar charge controller as an alternative towards system efficiency optimization
by: Sabry, Ahmad H., et al.
Published: (2014)
by: Sabry, Ahmad H., et al.
Published: (2014)
Determination of new anthropometric cut-off values for obesity screening in Indonesian adults
by: Hastuti, J., et al.
Published: (2017)
by: Hastuti, J., et al.
Published: (2017)
IIR Filter Order and Cut-off Frequency Influences on EMG Signal Smoothing
by: Zahari, Taha, et al.
Published: (2015)
by: Zahari, Taha, et al.
Published: (2015)
Metropolitan Development in Perth: Strategic Planning or Strategic Spin?
by: Alexander, Ian, et al.
Published: (2010)
by: Alexander, Ian, et al.
Published: (2010)
Integrating the Theory of Sampling into Underground Mine Grade Control Strategies
by: Dominy, Simon, et al.
Published: (2018)
by: Dominy, Simon, et al.
Published: (2018)
Design of grade control sampling programs for underground gold mines
by: Dominy, Simon, et al.
Published: (2011)
by: Dominy, Simon, et al.
Published: (2011)
Strategically On The Maritime Silk Route
Maritime Treasures Off The Malay Peninsula
by: Ooi, Keat Gin
Published: (2014)
by: Ooi, Keat Gin
Published: (2014)
Knowledge management strategic plan
by: Zakaria, Noor Azura, et al.
Published: (2011)
by: Zakaria, Noor Azura, et al.
Published: (2011)
New strategic plan for UPM
by: Rajaendram, Rebecca
Published: (2021)
by: Rajaendram, Rebecca
Published: (2021)
Purchasing in corporate strategic planning
by: Abdul Hamid, Abu Bakar, et al.
Published: (2007)
by: Abdul Hamid, Abu Bakar, et al.
Published: (2007)
Occupational Safety Risk Management: A Planning Model to Optimise Resource Allocation - Application to the Western Australian Mining Industry
by: Brnjak, Hennah Louise Shiner
Published: (2023)
by: Brnjak, Hennah Louise Shiner
Published: (2023)
Mine Waste Dump Optimisation Based on Carbon Footprint
by: Tobgay, Namgyel Sithup
Published: (2024)
by: Tobgay, Namgyel Sithup
Published: (2024)
Ultra-wideband and off-optimised five-port reflectometer using power splitters
by: Lee, Kim Yee, et al.
Published: (2018)
by: Lee, Kim Yee, et al.
Published: (2018)
Recolonisation of ants in rehabilitated open-cut mines in northern Australia
by: Majer, Jonathan
Published: (1984)
by: Majer, Jonathan
Published: (1984)
Instantaneous BeiDou+GPS RTK positioning with high cut-off elevation angles
by: Teunissen, Peter, et al.
Published: (2014)
by: Teunissen, Peter, et al.
Published: (2014)
Influence of recycled tyre amendment on the mechanical behaviour of soil-bentonite cut-off walls
by: Chegenizadeh, Amin, et al.
Published: (2018)
by: Chegenizadeh, Amin, et al.
Published: (2018)
Influence of an Earth Dam Cut-Off Plastic Concrete Component on Its Physical Properties
by: Kazemian, Sina, et al.
Published: (2016)
by: Kazemian, Sina, et al.
Published: (2016)
Establishing cut-off points for consistency in reporting hypoglycemia symptoms among diabetes patients
by: Sharmin, Afsana Al, et al.
Published: (2023)
by: Sharmin, Afsana Al, et al.
Published: (2023)
Optimisation of ultrasound treatment to enhance the postharvest life of fresh-cut pineapple
by: Yeoh, Wei Keat
Published: (2017)
by: Yeoh, Wei Keat
Published: (2017)
Stope boundary optimisation in underground mining based on a heuristic approachStope boundary optimisation in underground mining based on a heuristic approach
by: Sandanayake, Don Suneth Sameera
Published: (2014)
by: Sandanayake, Don Suneth Sameera
Published: (2014)
Similar Items
-
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016) -
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019) -
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011) -
An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
by: Qureshi, Muhammad Asim
Published: (2017) -
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018)