Skip to content
VuFind
Advanced
  • Cut-off Grades and Optimising...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Cut-off Grades and Optimising the Strategic Mine Plan
QR Code

Cut-off Grades and Optimising the Strategic Mine Plan

Bibliographic Details
Main Author: Hall, Brian
Format: Book
Published: Australasian Institute of Mining and Metallurgy 2014
Online Access:http://hdl.handle.net/20.500.11937/24711
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://hdl.handle.net/20.500.11937/24711

Similar Items

  • A review of cut-off grade policy models for open pit mining operations
    by: Asad, Mohammad, et al.
    Published: (2016)
  • A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
    by: Khan, A., et al.
    Published: (2019)
  • Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
    by: Asad, M., et al.
    Published: (2011)
  • An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
    by: Qureshi, Muhammad Asim
    Published: (2017)
  • A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
    by: Khan, A., et al.
    Published: (2018)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips