An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution however, can be achieved when integrating scheduling phases and accounting...
| Main Authors: | Topal, Erkan, Nehring, M., Kizil, M., Knights, P. |
|---|---|
| Other Authors: | E Topal |
| Format: | Conference Paper |
| Published: |
Australasian Institute of Mining and Metallurgy
2010
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/20.500.11937/23447 |
Similar Items
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Organizational, systems and human issues in production planning, scheduling and control
by: MacCarthy, Bart L.
Published: (2006)
by: MacCarthy, Bart L.
Published: (2006)
Optimisation of a Mixed Truck Fleet Schedule through a MIP Model Considering a New Truck-Purchase Option
by: Fu, Z., et al.
Published: (2014)
by: Fu, Z., et al.
Published: (2014)
Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Toward optimum value in underground mine scheduling
by: Maybee, Bryan, et al.
Published: (2010)
by: Maybee, Bryan, et al.
Published: (2010)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
REVIEW OF PRODUCTION PLANNING AND SCHEDULING: A CASE OF BOOTS CONTRACT MANUFACTURING (BCM)
by: KISIRKOI, CALEB LEKISHON
Published: (2016)
by: KISIRKOI, CALEB LEKISHON
Published: (2016)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer
by: Tandon, Ramit
Published: (2008)
by: Tandon, Ramit
Published: (2008)
Production scheduling of reconfigurable manufacturing systems using fuzzy logic techniques
by: Nehzati, Taravatsadat
Published: (2012)
by: Nehzati, Taravatsadat
Published: (2012)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
A heuristic algorithm for nurse scheduling with balanced preference satisfaction
by: Constantino, Ademir A., et al.
Published: (2011)
by: Constantino, Ademir A., et al.
Published: (2011)
Novel approaches to cyclic job-shop problems with transportation
by: Groenemeyer, Sven
Published: (2012)
by: Groenemeyer, Sven
Published: (2012)
Risk-based evaluation for underground mine planning
by: Maybee, Bryan, et al.
Published: (2011)
by: Maybee, Bryan, et al.
Published: (2011)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Development of Scheduling System for Stamping Die Production Using Simulation Dispatch Approach
by: Chew, Chee Leong
Published: (2004)
by: Chew, Chee Leong
Published: (2004)
Optimisation Models for Medium-Long Term Logistics Planning in Mining
by: Phangestu, Jimmi
Published: (2017)
by: Phangestu, Jimmi
Published: (2017)
Optimisation models and algorithms for workforce scheduling and routing
by: Castillo Salazar, José Arturo
Published: (2015)
by: Castillo Salazar, José Arturo
Published: (2015)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Channel-and delay - aware scheduling algorithms for wimax
by: You, Sin Yong
Published: (2013)
by: You, Sin Yong
Published: (2013)
Channel-and delay-aware scheduling algorithms for wimax
by: You, Sin Yong
Published: (2013)
by: You, Sin Yong
Published: (2013)
"You have to get wet to learn how to swim" applied to bridging the gap between research into personnel scheduling and its implementation in practice
by: Petrovic, Sanja
Published: (2017)
by: Petrovic, Sanja
Published: (2017)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Integration of Production Scheduling &
Transportation/Distribution Scheduling in A Supply Chain
by: Rawat, Saurav
Published: (2017)
by: Rawat, Saurav
Published: (2017)
Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty
by: Ajak, A., et al.
Published: (2017)
by: Ajak, A., et al.
Published: (2017)
Flexible job shop scheduling using priority heuristics and genetic algorithm
by: Farashahi, Hamid Ghaani
Published: (2010)
by: Farashahi, Hamid Ghaani
Published: (2010)
A heuristic algorithm based on multiassignment procedures for nurse scheduling
by: Constantino, Ademir Aparecido, et al.
Published: (2014)
by: Constantino, Ademir Aparecido, et al.
Published: (2014)
Strategic mine planning model using network flow model and real case application
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Robust, flexible and operational mine design strategies
by: Groeneveld, Benjamin James, et al.
Published: (2012)
by: Groeneveld, Benjamin James, et al.
Published: (2012)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
A review of soft computing technology applications in several mining problems
by: Jang, H., et al.
Published: (2014)
by: Jang, H., et al.
Published: (2014)
Subsidence prediction and mine design for underground coal mining in the Collie Basin
by: Misich, Ian J.
Published: (1997)
by: Misich, Ian J.
Published: (1997)
Similar Items
-
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012) -
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010) -
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013) -
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010) -
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)