An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution however, can be achieved when integrating scheduling phases and accounting...
| Main Authors: | , , , |
|---|---|
| Other Authors: | |
| Format: | Conference Paper |
| Published: |
Australasian Institute of Mining and Metallurgy
2010
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/20.500.11937/23447 |