An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling

Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution however, can be achieved when integrating scheduling phases and accounting...

Full description

Bibliographic Details
Main Authors: Topal, Erkan, Nehring, M., Kizil, M., Knights, P.
Other Authors: E Topal
Format: Conference Paper
Published: Australasian Institute of Mining and Metallurgy 2010
Subjects:
Online Access:http://hdl.handle.net/20.500.11937/23447
_version_ 1848751153535254528
author Topal, Erkan
Nehring, M.
Kizil, M.
Knights, P.
author2 E Topal
author_facet E Topal
Topal, Erkan
Nehring, M.
Kizil, M.
Knights, P.
author_sort Topal, Erkan
building Curtin Institutional Repository
collection Online Access
description Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution however, can be achieved when integrating scheduling phases and accounting for the interaction between short-term and long-term activities simultaneously. This paper addresses the task of integrating short- and long-term production plans by combining the short-term objective of minimising deviation to targeted mill feed grade with the long-term objective of maximising net present value (NPV) into a single mathematical model. A case study is presented which compares the present values of the same stope data set scheduled via separate long and short-term models and than by the proposed integrated model which applies a predetermined penalty for each tonne of metal deviation to target for the respective ore tonnage being processed. This allows an operation to obtain a globally optimal scheduling regime when taking into consideration the cost and loss of value resulting from fluctuations in grade to the mill over the short-term.
first_indexed 2025-11-14T07:48:12Z
format Conference Paper
id curtin-20.500.11937-23447
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T07:48:12Z
publishDate 2010
publisher Australasian Institute of Mining and Metallurgy
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-234472023-01-13T07:56:31Z An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling Topal, Erkan Nehring, M. Kizil, M. Knights, P. E Topal M Kuruppu Mine production scheduling Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution however, can be achieved when integrating scheduling phases and accounting for the interaction between short-term and long-term activities simultaneously. This paper addresses the task of integrating short- and long-term production plans by combining the short-term objective of minimising deviation to targeted mill feed grade with the long-term objective of maximising net present value (NPV) into a single mathematical model. A case study is presented which compares the present values of the same stope data set scheduled via separate long and short-term models and than by the proposed integrated model which applies a predetermined penalty for each tonne of metal deviation to target for the respective ore tonnage being processed. This allows an operation to obtain a globally optimal scheduling regime when taking into consideration the cost and loss of value resulting from fluctuations in grade to the mill over the short-term. 2010 Conference Paper http://hdl.handle.net/20.500.11937/23447 Australasian Institute of Mining and Metallurgy restricted
spellingShingle Mine production scheduling
Topal, Erkan
Nehring, M.
Kizil, M.
Knights, P.
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
title An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
title_full An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
title_fullStr An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
title_full_unstemmed An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
title_short An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
title_sort investigation to integrate optimum long-term planning with short planning in underground mine production scheduling
topic Mine production scheduling
url http://hdl.handle.net/20.500.11937/23447