Topal, E., Nehring, M., Kizil, M., Knights, P., & Topal, E. (2010). An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling. Australasian Institute of Mining and Metallurgy.
Chicago Style (17th ed.) CitationTopal, Erkan, M. Nehring, M. Kizil, P. Knights, and E. Topal. An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling. Australasian Institute of Mining and Metallurgy, 2010.
MLA (9th ed.) CitationTopal, Erkan, et al. An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling. Australasian Institute of Mining and Metallurgy, 2010.
Warning: These citations may not always be 100% accurate.