Skip to content
VuFind
Advanced
  • Designing work breakdown struc...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Designing work breakdown structure (WBS) in tunneling projects using neural networks
QR Code

Designing work breakdown structure (WBS) in tunneling projects using neural networks

Bibliographic Details
Main Authors: Sharifzadeh, Mostafa, Ataeepour, M., Siami, E., Ayatollahi, F.
Other Authors: n/a
Format: Conference Paper
Published: n/a 2011
Online Access:http://hdl.handle.net/20.500.11937/17979
  • Holdings
  • Description
  • Similar Items
  • Staff View
Description
Description not available.

Similar Items

  • Work breakdown structure (WBS) development for underground construction
    by: Siami-Irdemoosa, E., et al.
    Published: (2015)
  • Development of common work breakdown structure (WBS) for school project
    by: Abdullah, Azhar
    Published: (2006)
  • Geotechnical, structural and geodetic measurements for conventional tunnelling hazards in urban areas – The case of Niayesh road tunnel project
    by: Ghorbani, M., et al.
    Published: (2012)
  • Application of observational method in conventional tunnelling projects in urban areas- the case of Niayesh road tunnel project, Tehran, Iran
    by: Ghorbani, M., et al.
    Published: (2011)
  • Design Optimization In A Conventional Tunnelling Project In Urban Area Using The Observational Method- Niayesh Road Tunnel In Tehran, Iran
    by: Sharifzadeh, Mostafa, et al.
    Published: (2014)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips