Skip to content
VuFind
Advanced
  • Designing work breakdown struc...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Export Ready — 
Designing work breakdown structure (WBS) in tunneling projects using neural networks
QR Code

Designing work breakdown structure (WBS) in tunneling projects using neural networks

Bibliographic Details
Main Authors: Sharifzadeh, Mostafa, Ataeepour, M., Siami, E., Ayatollahi, F.
Other Authors: n/a
Format: Conference Paper
Published: n/a 2011
Online Access:http://hdl.handle.net/20.500.11937/17979
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://hdl.handle.net/20.500.11937/17979

Similar Items

  • Work breakdown structure (WBS) development for underground construction
    by: Siami-Irdemoosa, E., et al.
    Published: (2015)
  • Development of common work breakdown structure (WBS) for school project
    by: Abdullah, Azhar
    Published: (2006)
  • Geotechnical, structural and geodetic measurements for conventional tunnelling hazards in urban areas – The case of Niayesh road tunnel project
    by: Ghorbani, M., et al.
    Published: (2012)
  • Application of observational method in conventional tunnelling projects in urban areas- the case of Niayesh road tunnel project, Tehran, Iran
    by: Ghorbani, M., et al.
    Published: (2011)
  • Design Optimization In A Conventional Tunnelling Project In Urban Area Using The Observational Method- Niayesh Road Tunnel In Tehran, Iran
    by: Sharifzadeh, Mostafa, et al.
    Published: (2014)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips