Choosing Appropriate Contract Methods for Design-Build Projects
For design-build (DB) projects, owners normally use lump sum and guaranteed maximum price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteri...
| Main Authors: | Chen, Q., Xia, B., Jin, Z., Wu, Peng, Hu, Y. |
|---|---|
| Format: | Journal Article |
| Published: |
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/16478 |
Similar Items
Time and cost performance of design-build projects
by: Chen, Q., et al.
Published: (2016)
by: Chen, Q., et al.
Published: (2016)
How public owners communicate the sustainability requirements of green design-build projects
by: Xia, B., et al.
Published: (2014)
by: Xia, B., et al.
Published: (2014)
A study of factors influencing housing developers to choose appropriate procurement strategy
by: Raja Nurfarhana, Raja Razalli
Published: (2014)
by: Raja Nurfarhana, Raja Razalli
Published: (2014)
Using quantitative analysis to assess the appropriateness of infill buildings in historic settings
by: Hu, Yun, et al.
Published: (2017)
by: Hu, Yun, et al.
Published: (2017)
Novation agreement in design and build contracts
by: Sahil, Natasha
Published: (2008)
by: Sahil, Natasha
Published: (2008)
Contractual framework for design- bid- build contract to adopt Building Information Modeling in Jordan
by: Saraireh, Ibrahim Moh'd A. Q., et al.
Published: (2020)
by: Saraireh, Ibrahim Moh'd A. Q., et al.
Published: (2020)
Investigating the Impact of Project Definition Clarity on Project Performance: Structural Equation Modeling Study
by: Xia, B., et al.
Published: (2016)
by: Xia, B., et al.
Published: (2016)
Multi-Attribute Utility Theory for Selecting an Appropriate
Procurement Method in the Construction Projects
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
by: Sawalhi , Nabil I. El, et al.
Published: (2017)
Study on design in an appropriate system to enhance composting process methods
by: Abd Hamid, Khairul Bariyah, et al.
Published: (2016)
by: Abd Hamid, Khairul Bariyah, et al.
Published: (2016)
Factors influencing workplace accident costs of building projects
by: Feng, Y., et al.
Published: (2015)
by: Feng, Y., et al.
Published: (2015)
An evaluation of pre-construction contract variables influencing occupational safety & health performance in Malaysian design & build and design-bid-build construction projects
by: Thian, Kah Kien.
Published: (2011)
by: Thian, Kah Kien.
Published: (2011)
An overview of contract documents for building information modelling (BIM) construction projects
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
Project procurement method : the conflicts in construction projects procured under design and build method
by: Mai Ling, Teon
Published: (2014)
by: Mai Ling, Teon
Published: (2014)
Project management and green buildings: Lessons from the rating systems
by: Wu, Peng, et al.
Published: (2010)
by: Wu, Peng, et al.
Published: (2010)
Material screening and choosing methods – A review
by: Jahan, Ali, et al.
Published: (2010)
by: Jahan, Ali, et al.
Published: (2010)
Choosing a Design Science Research Methodology
by: Venable, John, et al.
Published: (2017)
by: Venable, John, et al.
Published: (2017)
Appropriate illustrations for appropriate functions : the taxonomy of illustration
by: Sheik Said, Normahdiah
Published: (2011)
by: Sheik Said, Normahdiah
Published: (2011)
A review of benchmarking in carbon labelling schemes for building materials
by: Wu, Peng, et al.
Published: (2014)
by: Wu, Peng, et al.
Published: (2014)
Appropriate control methods for mobile virtual exhibitions
by: Li, Yue, et al.
Published: (2018)
by: Li, Yue, et al.
Published: (2018)
Joint Contract-Function Effects on BIM-Enabled EPC Project Performance
by: Lee, C.Y., et al.
Published: (2020)
by: Lee, C.Y., et al.
Published: (2020)
Appropriate geometrical ratio modeling of atrium for energy
efficiency in office buildings
by: Nasrollahi, N., et al.
Published: (2015)
by: Nasrollahi, N., et al.
Published: (2015)
A survey on problem faced by contractors using design and build contract
by: Nurhajar, Abd Rahman
Published: (2009)
by: Nurhajar, Abd Rahman
Published: (2009)
Book Review – Appropriate Illustrations for Appropriate Functions: The Taxonomy of Illustration
by: Moris, Zailan
Published: (2013)
by: Moris, Zailan
Published: (2013)
TEAM BUILDING AND COORDINATION FOR DESIGN -BUILD MULTIPLE PROJECTS
by: C.T, Ramanathan, et al.
Published: (2007)
by: C.T, Ramanathan, et al.
Published: (2007)
Choosing your career
by: Ab Hamid, Zuraini
Published: (2020)
by: Ab Hamid, Zuraini
Published: (2020)
The understanding of contract documentation in project implementation
by: Madon, Zulkifly
Published: (2005)
by: Madon, Zulkifly
Published: (2005)
Investigating The Purchase Intention Of House Buyers‟ In Choosing Between Sell Then Build (Stb) Or Build Then Sell (Bts) House
by: Jusoh, Mohd Hanafi
Published: (2015)
by: Jusoh, Mohd Hanafi
Published: (2015)
Analysis on the problems faced by contractors implementing traditional and design & build contract in Malaysia
by: Norziatul Husna, Mohd Ridzuan
Published: (2012)
by: Norziatul Husna, Mohd Ridzuan
Published: (2012)
Appropriation and Dementia in India
by: Brijnath, Bianca, et al.
Published: (2011)
by: Brijnath, Bianca, et al.
Published: (2011)
Development of an appropriate and robust dissolution method for solid dosage forms
by: Mandal, Uttam Kumar
Published: (2011)
by: Mandal, Uttam Kumar
Published: (2011)
Force Appropriation Method for Two Degrees of Freedom Nonlinear System
by: M. S. M., Sani, et al.
Published: (2015)
by: M. S. M., Sani, et al.
Published: (2015)
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Issues in choosing ethical business leaders: essential criterions to choose an ethical business leader
by: Sarif, Suhaimi Mhd, et al.
Published: (2011)
by: Sarif, Suhaimi Mhd, et al.
Published: (2011)
The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz
by: Mohd Hapiz, Muhammad Husnir Rahman
Published: (2015)
by: Mohd Hapiz, Muhammad Husnir Rahman
Published: (2015)
Capacity building needs of small and medium contracting enterprises in Klang Valley Malaysia
by: Lee, Wah Peng, et al.
Published: (2020)
by: Lee, Wah Peng, et al.
Published: (2020)
The Effects of Project Triple Constraint on Malaysia Building Projects
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
Requirements Uncertainty in Contract Software Development Projects
by: Mellis, W., et al.
Published: (2013)
by: Mellis, W., et al.
Published: (2013)
Influence of technical challenges on construction project contracting
by: Coleman, Charles Egyabeng, et al.
Published: (2025)
by: Coleman, Charles Egyabeng, et al.
Published: (2025)
Importance Of Packaging Design Elements In Choosing Local Brands By Foreigners In Malaysia
by: Sharififar, Foroozan
Published: (2011)
by: Sharififar, Foroozan
Published: (2011)
Help with choosing the right disinfectants
by: Chooi, Wen Han, et al.
Published: (2021)
by: Chooi, Wen Han, et al.
Published: (2021)
Similar Items
-
Time and cost performance of design-build projects
by: Chen, Q., et al.
Published: (2016) -
How public owners communicate the sustainability requirements of green design-build projects
by: Xia, B., et al.
Published: (2014) -
A study of factors influencing housing developers to choose appropriate procurement strategy
by: Raja Nurfarhana, Raja Razalli
Published: (2014) -
Using quantitative analysis to assess the appropriateness of infill buildings in historic settings
by: Hu, Yun, et al.
Published: (2017) -
Novation agreement in design and build contracts
by: Sahil, Natasha
Published: (2008)