Choosing Appropriate Contract Methods for Design-Build Projects

For design-build (DB) projects, owners normally use lump sum and guaranteed maximum price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteri...

Full description

Bibliographic Details
Main Authors: Chen, Q., Xia, B., Jin, Z., Wu, Peng, Hu, Y.
Format: Journal Article
Published: 2016
Online Access:http://hdl.handle.net/20.500.11937/16478