Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules
Optimisation techniques for underground metalliferous mine design and planning are not commonplace like their open cut counterpart. Optimisation studies which have focused on underground design and planning are amenable to improvement. Additionally, all techniques have ignored the effects that under...
| Main Authors: | Little, J., Topal, Erkan, Knights, P. |
|---|---|
| Format: | Journal Article |
| Published: |
Australasian Institute of Mining and Metallurgy
2011
|
| Online Access: | http://hdl.handle.net/20.500.11937/13950 |
Similar Items
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
A new algorithm for stope boundary optimization
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine
by: Erdogan, G., et al.
Published: (2017)
by: Erdogan, G., et al.
Published: (2017)
Stope boundary optimisation in underground mining based on a heuristic approachStope boundary optimisation in underground mining based on a heuristic approach
by: Sandanayake, Don Suneth Sameera
Published: (2014)
by: Sandanayake, Don Suneth Sameera
Published: (2014)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Using Artificial Neural Networks (ANNs) to Predict Stope Overbreak at Plutonic Underground Gold Mine
by: Boxwell, D., et al.
Published: (2014)
by: Boxwell, D., et al.
Published: (2014)
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022)
by: Fathollahzadeh, Karo
Published: (2022)
Predicting overbreak and underbreak in underground longhole stoping using meta-soft computing models
by: Taheri, Sina, et al.
Published: (2025)
by: Taheri, Sina, et al.
Published: (2025)
Decision support system of unplanned dilution and ore-loss in underground stoping operations using a neuro-fuzzy system
by: Jang, Hyong Doo, et al.
Published: (2015)
by: Jang, Hyong Doo, et al.
Published: (2015)
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses
by: Jang, Hyong Doo, et al.
Published: (2015)
by: Jang, Hyong Doo, et al.
Published: (2015)
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
Optimisation of a Mixed Truck Fleet Schedule through a MIP Model Considering a New Truck-Purchase Option
by: Fu, Z., et al.
Published: (2014)
by: Fu, Z., et al.
Published: (2014)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Packet scheduling algorithms for long term evolution
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2011)
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2011)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Dilution prediction in underground open stope mining using gene expression programming and backpropagation artificial neural network algorithms
by: Chimunhu, Prosper, et al.
Published: (2025)
by: Chimunhu, Prosper, et al.
Published: (2025)
Quality-driven scheduling for long-term evolution system
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2011)
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2011)
Comparison between scheduling techniques in long term evolution
by: Habaebi, Mohamed Hadi, et al.
Published: (2013)
by: Habaebi, Mohamed Hadi, et al.
Published: (2013)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Simulation of packet scheduling in cognitive long term evolution-advanced
by: Mansor, Mohama 'Ismat Hafizi, et al.
Published: (2017)
by: Mansor, Mohama 'Ismat Hafizi, et al.
Published: (2017)
An investigation of packet scheduling algorithms for long term evolution-advanced
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2012)
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2012)
Optimisation Models for Medium-Long Term Logistics Planning in Mining
by: Phangestu, Jimmi
Published: (2017)
by: Phangestu, Jimmi
Published: (2017)
A study of packet scheduling algorithms in long term evolution-advanced
by: Ul Islam Mattoo, Mohd Mueen, et al.
Published: (2019)
by: Ul Islam Mattoo, Mohd Mueen, et al.
Published: (2019)
Modeling and simulation of packet scheduling in the downlink long term evolution system
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2009)
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2009)
An Islamic reading of Marie Stopes’ married love
by: Hasan, Md. Mahmudul
Published: (2017)
by: Hasan, Md. Mahmudul
Published: (2017)
Geotechnical considerations for planning and design of open stopes
by: Villaescusa, Ernesto
Published: (2008)
by: Villaescusa, Ernesto
Published: (2008)
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014)
by: Li, Y., et al.
Published: (2014)
Optimisation of simultaneous saccharification and fermentation for biobutanol production using oil palm empty fruit bunch
by: Md Razali, Nur Atheera Aiza
Published: (2018)
by: Md Razali, Nur Atheera Aiza
Published: (2018)
Similar Items
-
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
by: Topal, Erkan, et al.
Published: (2010) -
A new algorithm for stope boundary optimization
by: Topal, Erkan, et al.
Published: (2010) -
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012) -
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010) -
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)