Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules
Optimisation techniques for underground metalliferous mine design and planning are not commonplace like their open cut counterpart. Optimisation studies which have focused on underground design and planning are amenable to improvement. Additionally, all techniques have ignored the effects that under...
| Main Authors: | , , |
|---|---|
| Format: | Journal Article |
| Published: |
Australasian Institute of Mining and Metallurgy
2011
|
| Online Access: | http://hdl.handle.net/20.500.11937/13950 |