Little, J., Topal, E., & Knights, P. (2011). Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules. Australasian Institute of Mining and Metallurgy.
Chicago Style (17th ed.) CitationLittle, J., Erkan Topal, and P. Knights. Simultaneous Optimisation of Stope Boundaries and Long Term Production Scheduling for Production Shedules. Australasian Institute of Mining and Metallurgy, 2011.
MLA (9th ed.) CitationLittle, J., et al. Simultaneous Optimisation of Stope Boundaries and Long Term Production Scheduling for Production Shedules. Australasian Institute of Mining and Metallurgy, 2011.
Warning: These citations may not always be 100% accurate.