Skip to content
VuFind
Advanced
  • Rework in the design, construc...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Rework in the design, construction and operation of floating production storage offloading hydrocarbon projects
QR Code

Rework in the design, construction and operation of floating production storage offloading hydrocarbon projects

Bibliographic Details
Main Authors: Love, Peter, Davis, Peter
Other Authors: Melbourne University (School of Design)
Format: Conference Paper
Published: MSD 2010
Online Access:http://www.msd.unimelb.edu.au/events/conferences/aubea2010/submission.html
http://hdl.handle.net/20.500.11937/11397
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://www.msd.unimelb.edu.au/events/conferences/aubea2010/submission.html
http://hdl.handle.net/20.500.11937/11397

Similar Items

  • The latent causes of rework in floating production storage and offloading projects
    by: Love, Peter, et al.
    Published: (2014)
  • Critical success factors of the Floating, Production, Storage and Offloading (“FPSO”) projects
    by: Ong, Johnny, Shou Yee
    Published: (2013)
  • Dynamics of Rework in Complex Offshore Hydrocarbon Projects
    by: Love, Peter, et al.
    Published: (2011)
  • Making Sense of Rework Causation in Offshore Hydrocarbon Projects
    by: Love, Peter, et al.
    Published: (2016)
  • Forensic Project Management: Simulation Modelling of Rework in Construction Projects
    by: Love, Peter
    Published: (2009)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips