Construction of Raw Sugar Silos Using Dynamic Replacement

Two raw sugar silos, each 55 m high, have been constructed on improved ground in Al Khaleej Sugar Factory located in Dubai’s Jebel Ali area. The preliminary geotechnical investigation indicated that the upper 6 m of soil was composed of loose to dense silty sand followed by weak bedrock, and that it...

Full description

Bibliographic Details
Main Authors: Hamidi, Babak, Varaksin, Serge, Nikraz, Hamid
Other Authors: Buddhima Indraratna
Format: Conference Paper
Published: Research Publishing 2012
Subjects:
Online Access:http://hdl.handle.net/20.500.11937/11139
_version_ 1848747725252722688
author Hamidi, Babak
Varaksin, Serge
Nikraz, Hamid
author2 Buddhima Indraratna
author_facet Buddhima Indraratna
Hamidi, Babak
Varaksin, Serge
Nikraz, Hamid
author_sort Hamidi, Babak
building Curtin Institutional Repository
collection Online Access
description Two raw sugar silos, each 55 m high, have been constructed on improved ground in Al Khaleej Sugar Factory located in Dubai’s Jebel Ali area. The preliminary geotechnical investigation indicated that the upper 6 m of soil was composed of loose to dense silty sand followed by weak bedrock, and that it was not possible to construct the silos without implementation of special foundation measures. Ground improvement by dynamic replacement was chosen as the most affordable technical solution. Treatment was carried out by initially excavating the ground to the working platform level. For each silo, the impact points were individually excavated and backfilled with crushed rock. A rock filled shear ring trench was also realized at the periphery by excavating the silty sand to the depth of 2 m. The project faced special challenges due to the vicinity of an existing sugar silo at a minimum distance of 10 m from the works, the presence of a highly cemented and previously unidentified sand layer in parts of one of the silos, and a high groundwater table. A total of 29 Menard Pressuremter Tests (PMT) were carried out after soil improvement to verify that acceptance criteria had been satisfied.
first_indexed 2025-11-14T06:53:43Z
format Conference Paper
id curtin-20.500.11937-11139
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T06:53:43Z
publishDate 2012
publisher Research Publishing
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-111392023-02-02T07:57:37Z Construction of Raw Sugar Silos Using Dynamic Replacement Hamidi, Babak Varaksin, Serge Nikraz, Hamid Buddhima Indraratna Cholachat Rujikiatkamjorn Jayan Vinod Dynamic replacement Pressuremeter Soil improvement Ground improvement Two raw sugar silos, each 55 m high, have been constructed on improved ground in Al Khaleej Sugar Factory located in Dubai’s Jebel Ali area. The preliminary geotechnical investigation indicated that the upper 6 m of soil was composed of loose to dense silty sand followed by weak bedrock, and that it was not possible to construct the silos without implementation of special foundation measures. Ground improvement by dynamic replacement was chosen as the most affordable technical solution. Treatment was carried out by initially excavating the ground to the working platform level. For each silo, the impact points were individually excavated and backfilled with crushed rock. A rock filled shear ring trench was also realized at the periphery by excavating the silty sand to the depth of 2 m. The project faced special challenges due to the vicinity of an existing sugar silo at a minimum distance of 10 m from the works, the presence of a highly cemented and previously unidentified sand layer in parts of one of the silos, and a high groundwater table. A total of 29 Menard Pressuremter Tests (PMT) were carried out after soil improvement to verify that acceptance criteria had been satisfied. 2012 Conference Paper http://hdl.handle.net/20.500.11937/11139 Research Publishing restricted
spellingShingle Dynamic replacement
Pressuremeter
Soil improvement
Ground improvement
Hamidi, Babak
Varaksin, Serge
Nikraz, Hamid
Construction of Raw Sugar Silos Using Dynamic Replacement
title Construction of Raw Sugar Silos Using Dynamic Replacement
title_full Construction of Raw Sugar Silos Using Dynamic Replacement
title_fullStr Construction of Raw Sugar Silos Using Dynamic Replacement
title_full_unstemmed Construction of Raw Sugar Silos Using Dynamic Replacement
title_short Construction of Raw Sugar Silos Using Dynamic Replacement
title_sort construction of raw sugar silos using dynamic replacement
topic Dynamic replacement
Pressuremeter
Soil improvement
Ground improvement
url http://hdl.handle.net/20.500.11937/11139