Construction of Raw Sugar Silos Using Dynamic Replacement
Two raw sugar silos, each 55 m high, have been constructed on improved ground in Al Khaleej Sugar Factory located in Dubai’s Jebel Ali area. The preliminary geotechnical investigation indicated that the upper 6 m of soil was composed of loose to dense silty sand followed by weak bedrock, and that it...
| Main Authors: | , , |
|---|---|
| Other Authors: | |
| Format: | Conference Paper |
| Published: |
Research Publishing
2012
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/20.500.11937/11139 |