Component Optimisation of Multiple D&B Bridge projects: A Case Study in Sabah, Malaysia
The construction process and success in management of multiple bridge projects directly relies on the selection and optimization of their components. A systematic optimization process is adopted during the conceptual design stage to overcome the resource constraints during the construction phase....
Main Authors: | C.T., Ramanathan, Sambu Potty, Narayanan, B. Idrus, Arazi |
---|---|
Format: | Citation Index Journal |
Published: |
World Academy of Science Engineering and Technology
2009
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/948/ http://eprints.utp.edu.my/948/1/eprintscopy.doc |
Similar Items
-
SUSTAINABLE MANAGEMENT OF
MULTIPLE D&B INFRASTRUCTURE
PROJECTS IN RURAL AREAS OF SABAH
by: Sambu Potty, Narayanan, et al.
Published: (2010) -
MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
by: Sambu Potty, Narayanan, et al.
Published: (2009) -
ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
by: C.T, Ramanathan, et al.
Published: (2008) -
Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
by: C.T, Ramanathan, et al.
Published: (2009) -
Multiple Infrastructure D&B Project Management in
Rural Areas in Malaysia
by: C.T, Ramanathan, et al.
Published: (2007)