Bottleneck adjacent matching 3 (BAM3) heuristic for re-entrant flow shop with dominant machine

This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internetbased collaborative design and manufacturing between the Universiti Tun Hussein...

Full description

Bibliographic Details
Main Authors: S. A. , Bareduan, S. H., Hasan
Format: Conference or Workshop Item
Subjects:
Online Access:http://eprints.uthm.edu.my/258/
http://eprints.uthm.edu.my/258/1/s_a_bareduan.pdf