A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects

Developing countries have seen an increase in construction of tall buildings in metropolitan cities due to space constraint. The construction of tall buildings in developing countries is undertaken as a combination of manpower and equipment to economize costs. This combination or interface of man...

Full description

Bibliographic Details
Main Authors: Parthasarathy, Mudumbai Krishnaswamy, Murugasan, Rajiah, Murugesan, Kavitha
Format: Article
Published: Penerbit Universiti Sains Malaysia 2017
Subjects:
Online Access:http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.1.pdf
http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.1.pdf
http://eprints.usm.my/41422/1/jcdc2017.22.s1.1.pdf
id usm-41422
recordtype eprints
spelling usm-414222018-08-20T03:10:26Z A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects Parthasarathy, Mudumbai Krishnaswamy Murugasan, Rajiah Murugesan, Kavitha TH1-9745 Building construction Developing countries have seen an increase in construction of tall buildings in metropolitan cities due to space constraint. The construction of tall buildings in developing countries is undertaken as a combination of manpower and equipment to economize costs. This combination or interface of manpower and equipment, particularly in the basic activities such as concreting, reinforcement, formwork, blockwork, and plastering affects productivity of both the resources. This research aims at studying the factors affecting productivity of manpower and equipment at the micro level for the basic activities of construction for tall building projects. The factors have been further grouped and combined as sections. Responses collected through questionnaire survey from 109 personnel associated with the construction of 72 tall buildings in different geographies of India have been analysed using theoretical tools like frequency index, Spearman's rank correlation coeffcient, and factor analysis. The factors have been prioritized in descending order of frequency indices. Based on analysis, it is found that factors in human and planning groups are more influential and affect manpower and equipment productivity signifcantly. Contract managers and cost engineers can use this study to make allowance while analysing productivity and estimating costs for tall buildings having combined usage of manpower and equipment. Penerbit Universiti Sains Malaysia 2017 Article PeerReviewed application/pdf http://eprints.usm.my/41422/1/jcdc2017.22.s1.1.pdf http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.1.pdf Parthasarathy, Mudumbai Krishnaswamy and Murugasan, Rajiah and Murugesan, Kavitha (2017) A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects. Journal of Construction in Developing Countries , 22 (1). pp. 1-18. ISSN 1823-6499 http://eprints.usm.my/41422/
institution Universiti Sains Malaysia
Universiti Sains Malaysia
repository_type Digital Repository
institution_category Local University
building USM Repository
collection Online Access
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Parthasarathy, Mudumbai Krishnaswamy
Murugasan, Rajiah
Murugesan, Kavitha
A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects
description Developing countries have seen an increase in construction of tall buildings in metropolitan cities due to space constraint. The construction of tall buildings in developing countries is undertaken as a combination of manpower and equipment to economize costs. This combination or interface of manpower and equipment, particularly in the basic activities such as concreting, reinforcement, formwork, blockwork, and plastering affects productivity of both the resources. This research aims at studying the factors affecting productivity of manpower and equipment at the micro level for the basic activities of construction for tall building projects. The factors have been further grouped and combined as sections. Responses collected through questionnaire survey from 109 personnel associated with the construction of 72 tall buildings in different geographies of India have been analysed using theoretical tools like frequency index, Spearman's rank correlation coeffcient, and factor analysis. The factors have been prioritized in descending order of frequency indices. Based on analysis, it is found that factors in human and planning groups are more influential and affect manpower and equipment productivity signifcantly. Contract managers and cost engineers can use this study to make allowance while analysing productivity and estimating costs for tall buildings having combined usage of manpower and equipment.
format Article
author Parthasarathy, Mudumbai Krishnaswamy
Murugasan, Rajiah
Murugesan, Kavitha
author_facet Parthasarathy, Mudumbai Krishnaswamy
Murugasan, Rajiah
Murugesan, Kavitha
author_sort Parthasarathy, Mudumbai Krishnaswamy
title A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects
title_short A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects
title_full A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects
title_fullStr A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects
title_full_unstemmed A Critical Review of Factors Affecting Manpower and Equipment Productivity in Tall Building Construction Projects
title_sort critical review of factors affecting manpower and equipment productivity in tall building construction projects
publisher Penerbit Universiti Sains Malaysia
publishDate 2017
url http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.1.pdf
http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.1.pdf
http://eprints.usm.my/41422/1/jcdc2017.22.s1.1.pdf
first_indexed 2018-09-08T09:55:43Z
last_indexed 2018-09-08T09:55:43Z
_version_ 1611032736760332288