A study for optimum productivity yield in 0.16μm mixed of wafer fabrication facility

This research is to study the opportunity to achieve optimum productivity yield in 0.16μm product mixed through understanding the impact of loading utilization towards the capacity. The study is important to model the overall strategy of product loading planning to get highest achievable product out...

Full description

Bibliographic Details
Main Authors: Chik, M.A., Yung, V.C., Balakrishna, P., Hashim, U., Ahmad, I., Mohamad, B.
Published: 2017
Online Access:http://dspace.uniten.edu.my:8080/jspui/handle/123456789/5250