Multi-objective integrated production planning model and simulation constrained doubly by resources and materials
Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meinta...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.ums.edu.my/20591/ http://eprints.ums.edu.my/20591/1/Multi%20objective%20integrated%20production%20planning%20model%20and%20simulation%20constrained%20doubly%20by%20resources%20and%20materials.pdf |
id |
ums-20591 |
---|---|
recordtype |
eprints |
spelling |
ums-205912018-08-07T07:14:31Z http://eprints.ums.edu.my/20591/ Multi-objective integrated production planning model and simulation constrained doubly by resources and materials Wang Cheng, Liu, Xiao bing Zhao, Guo zhi Chin, Kim On QA75 Electronic computers. Computer science Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meintains safety inventory as its optimization objectives, and can achieve the integrated optimization method provided by the model has strong feasibility and effectness. 2016 Article PeerReviewed text en http://eprints.ums.edu.my/20591/1/Multi%20objective%20integrated%20production%20planning%20model%20and%20simulation%20constrained%20doubly%20by%20resources%20and%20materials.pdf Wang Cheng, and Liu, Xiao bing and Zhao, Guo zhi and Chin, Kim On (2016) Multi-objective integrated production planning model and simulation constrained doubly by resources and materials. International Journal of Simulation Modelling, 13 (2). pp. 243-254. ISSN 1726-4529 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Sabah Malaysia |
building |
UMS Institutional Repository |
collection |
Online Access |
language |
English |
topic |
QA75 Electronic computers. Computer science |
spellingShingle |
QA75 Electronic computers. Computer science Wang Cheng, Liu, Xiao bing Zhao, Guo zhi Chin, Kim On Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
description |
Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meintains safety inventory as its optimization objectives, and can achieve the integrated optimization method provided by the model has strong feasibility and effectness. |
format |
Article |
author |
Wang Cheng, Liu, Xiao bing Zhao, Guo zhi Chin, Kim On |
author_facet |
Wang Cheng, Liu, Xiao bing Zhao, Guo zhi Chin, Kim On |
author_sort |
Wang Cheng, |
title |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_short |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_full |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_fullStr |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_full_unstemmed |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_sort |
multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
publishDate |
2016 |
url |
http://eprints.ums.edu.my/20591/ http://eprints.ums.edu.my/20591/1/Multi%20objective%20integrated%20production%20planning%20model%20and%20simulation%20constrained%20doubly%20by%20resources%20and%20materials.pdf |
first_indexed |
2018-09-05T09:44:53Z |
last_indexed |
2018-09-05T09:44:53Z |
_version_ |
1610760264408367104 |