Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization
Productivity can be greatly improved by converting the traditional assembly line to a seru system, especially in the business environment with short product life cycles, uncertain product types and fluctuating production volumes. Line-seru conversion includes two decision processes, i.e., seru forma...
Main Authors: | Yu, Yang, Wang, Sihan, Tang, Jiafu, Kaku, Ikou, Sun, Wei |
---|---|
Format: | Online |
Language: | English |
Published: |
Springer International Publishing
2016
|
Online Access: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4916081/ |
Similar Items
-
Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem
by: Chen, Xiaopan, et al.
Published: (2015) -
A Short Path Quantum Algorithm for Exact Optimization
by: M. B. Hastings
Published: (2018-07-01) -
Multi-objective Functions in Grid Scheduling
by: Zafril Rizal, M Azmi, et al.
Published: (2015) -
Multi-Objective Day-Ahead Optimal Scheduling of Isolated Microgrid Considering Flexibility
by: Zhang Liang, et al.
Published: (2018-01-01) -
A genetic algorithm for unconstrained multi-objective optimization
by: Long, Q., et al.
Published: (2015)