Single Machine Scheduling and Due Date Assignment with Past-Sequence-Dependent Setup Time and Position-Dependent Processing Time

This paper considers single machine scheduling and due date assignment with setup time. The setup time is proportional to the length of the already processed jobs; that is, the setup time is past-sequence-dependent (p-s-d). It is assumed that a job's processing time depends on its position in a...

Full description

Bibliographic Details
Main Authors: Zhao, Chuan-Li, Hsu, Chou-Jung, Hsu, Hua-Feng
Format: Online
Language:English
Published: Hindawi Publishing Corporation 2014
Online Access:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4167446/