Feasibility of using bolted shear connector with cold-formed steel in composite construction

In conventional composite construction for hot-rolled steel (HRS) section, the composite action is usually achieved by using headed studs shear connectors. But, for cold-formed steel (CFS) section, the use of headed studs is not feasible as the section is very thin and difficult to be weld. Therefor...

Full description

Bibliographic Details
Main Author: Muhammad Nor Hisyam Bin Kamarudin
Other Authors: Mustapha Muhammad Lawan
Format: Journal
Published: Jurnal Teknologi, Universiti Teknologi Malaysia 2016
Subjects:
Online Access:http://www.myjurnal.my/public/article-view.php?id=99524