Optimization of Assembly Line Balancing with Resource Constraint using NSGA-II: A Case Study
Assembly line balancing type-e problem with resource constraint (ALBE-RC) is an attempt to assign the tasks to a minimal number of workstation with minimum cycle time by considering the resource constraint. Due to rapid growth in manufacturing and limited number of resources in industry, all the tas...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English English English |
Published: |
Research India Publications
2016
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/ http://umpir.ump.edu.my/id/eprint/8243/1/Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource%20Constraint%20using%20NSGA-II-%20A%20Case%20Study.pdf http://umpir.ump.edu.my/id/eprint/8243/7/c-f158.pdf http://umpir.ump.edu.my/id/eprint/8243/13/fist-2017-mashitah-%20Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource.pdf |
Internet
http://umpir.ump.edu.my/id/eprint/8243/http://umpir.ump.edu.my/id/eprint/8243/
http://umpir.ump.edu.my/id/eprint/8243/
http://umpir.ump.edu.my/id/eprint/8243/1/Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource%20Constraint%20using%20NSGA-II-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/8243/7/c-f158.pdf
http://umpir.ump.edu.my/id/eprint/8243/13/fist-2017-mashitah-%20Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource.pdf