Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
This paper proposes a conceptual framework for owner- contractor relationship and time–cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocat...
Main Authors: | Al Hazza, Muataz Hazza Faizi, Adesta, Erry Yulian Triblas, Al Fadel, Mohammad |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
Institute of Electrical and Electronics Engineers Inc.
2015
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/1/42771.pdf http://irep.iium.edu.my/42771/4/42771_Modeling%20a%20conceptual%20framework.SCOPUS.pdf |
Similar Items
-
Modelling and analysing the cutting forces in high speed hard end milling using neural network
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2015) -
Simulation of real time tracking system using RFID technology to enhance quality activities in flexible manufacturing system
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2017) -
Development of empirical models for surface roughness during high speed turning for hard materials using Box-Behnken design
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2011) -
Experimental investigations in high-speed hard turning of AISI 4340 steel using mixed ceramic
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2011) -
Development of tooling cost model in high speed hard turning
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2011)