Multi‐criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences
Main Authors: | CHEE H., WONG, GARY D., HOLT, PHIL, HARRIS |
---|---|
Format: | text |
Language: | eng |
Published: |
Emerald
2001
|
Subjects: |
Similar Items
-
A multi-agent systems-based contractor pre-qualification model
by: Faikcan, Kog, et al.
Published: (2016) -
An Analysis of the Decisive Criteria in Formwork Selection Problem
by: Krawczyńska-Piechna A.
Published: (2016-03-01) -
Courier service quality from the clients’ perspective
by: Gulc Aleksandra
Published: (2017-03-01) -
Target cost contracts: an analysis of the interplay between fee, target, share and price
by: JOHN G., PERRY, et al.
Published: (2000) -
Supporting building administrator’s decisions in determining maintenance costs of residential buildings
by: Robert Bucoń, et al.
Published: (2016-04-01)