Risk measurement and optimization model of coal generation contracts for the difference between prospect M-V and normal triangular fuzzy stochastic variables
Main Authors: | Weiwei, Li, Chong, Wu, He, Dong, Huan, Wang, Mei, Li |
---|---|
Format: | text |
Language: | eng |
Published: |
Emerald
2016
|
Subjects: |
Similar Items
-
Fully fuzzy linear systems of triangular fuzzy numbers (a,b,c)
by: Amit, Kumar, et al.
Published: (2013) -
Basic Formal Properties of Triangular Norms and Conorms
by: Grabowski Adam
Published: (2017-07-01) -
Aggregation Operators on Triangular Intuitionistic Fuzzy Numbers and its Application to Multi-Criteria Decision Making Problems
by: Liang Changyong, et al.
Published: (2014-07-01) -
A POSSIBILISTIC APPROACH TO CALCULATING THE INTERNAL RATE OF RETURN FOR INVESTMENT PROJECTS WITH FUZZY CASH FLOWS
by: E. S. Volkova, et al.
Published: (2014-01-01) -
Summary of the Port Shoreline Resource Evaluation Based on Triangular Fuzzy Analytic Hierarchy Process
by: Jiang Liupeng, et al.
Published: (2017-11-01)