An introduction of Industrialised Building System : Manual for developer

Bibliographic Details
Corporate Author: Construction Industry Development Board Malaysia (CIDB)
Format: Book
Published: Kuala Lumpur, Malaysia : Construction Industry Development Board Malaysia (CIDB) , 2014
Subjects:

MARC

LEADER 00000cam a2200000 7i4500
001 0000087934
005 20150314.0
008 150210s2014 my
020 |a 9789675317903 
050 0 0 |a TH113.M32   |b A5 2014 
090 0 0 |a TH113.M32   |b A5 2014 
245 0 3 |a An introduction of Industrialised Building System :   |b Manual for developer   |c Construction Industry Development Board Malaysia (CIDB) 
260 |a Kuala Lumpur, Malaysia :   |b Construction Industry Development Board Malaysia (CIDB) ,   |c 2014 
300 |a 30p. :   |b ill. ;   |c 25 cm. 
505 0 |a General -- 2. Challenges in IBS implementation -- 3. Process flow for housing construction by developer -- 4. Productivity comparison between conventional and IBS construction -- 5. Business model for IBS developer -- 6. Summary 
650 0 |a Building   |x Estimates   |z Malaysia   |x Management 
650 0 |a Construction contracts   |z Malaysia   |x Management 
650 0 |a Construction industry   |z Malaysia   |x Management 
710 2 |a Construction Industry Development Board Malaysia (CIDB) 
999 |a 1000162893   |b Book   |c OPEN SHELF (30 DAYS)   |e Gong Badak Campus 
999 |a 1000162894   |b Book   |c OPEN SHELF (30 DAYS)   |e Gong Badak Campus