|
|
|
|
| LEADER |
00000cam a2200000 7i4500 |
| 001 |
0000086708 |
| 008 |
140722s2013 my eng |
| 050 |
0 |
0 |
|a TK3271
|b T73 2013
|
| 090 |
0 |
0 |
|a TK3271
|b T73 2013
|
| 111 |
1 |
|
|a Training course
|d (10-11 September 2013 : Putrajaya)
|
| 245 |
1 |
0 |
|a Design and installation of electrical system in buildings
|b incorporating energy-efficiency measures, 10-11 September 2013, Palm Garden Hotel, IOI Resort, Putrajaya
|c organised by Breakthrough Consultant
|
| 260 |
|
|
|a Putrajaya
|b 2013
|
| 300 |
|
|
|a 1v. (various paging)
|b ill.
|c 30 cm
|
| 650 |
|
0 |
|a Buildings, Prefabricated
|
| 650 |
|
0 |
|a Electric wiring, Interior
|
| 650 |
|
0 |
|a System design
|
| 710 |
2 |
|
|a Breakthrough Consultant
|
| 999 |
|
|
|a 1000161751
|b Seminar Papers
|c Reference
|e Gong Badak Campus
|