|
|
|
|
| LEADER |
00000cam a2200000 7i4500 |
| 001 |
0000086611 |
| 005 |
20141019093000.0 |
| 008 |
140519s2014 nju eng |
| 020 |
|
|
|a 1118634489
|
| 020 |
|
|
|a 1118634551
|
| 020 |
|
|
|a 1118634616
|
| 020 |
|
|
|a 1118634640
|
| 020 |
|
|
|a 9781118634486
|
| 020 |
|
|
|a 9781118634554
|
| 020 |
|
|
|a 9781118634615
|
| 020 |
|
|
|a 9781118634646
|
| 050 |
0 |
0 |
|a HN29
|b .S27 2014
|
| 090 |
0 |
0 |
|a HN29
|b .S27 2014
|
| 100 |
1 |
|
|a Saris, Willem E. ,
|e author
|
| 245 |
1 |
0 |
|a Design, evaluation, and analysis of questionnaires for survey research
|c Willem E. Saris and Irmtraud N. Gallhofer
|
| 250 |
|
|
|a 2nd ed
|
| 260 |
|
|
|a Hoboken, New Jersey :
|b Wiley ,
|c c2014
|
| 300 |
|
|
|a xvii, 355 p. :
|b ill. ;
|c 24 cm.
|
| 490 |
1 |
|
|a Wiley series in survey methodology
|
| 504 |
|
|
|a Includes bibliographical references (p. 336-351) and index
|
| 505 |
0 |
|
|a 1. Introduction -- 2. Concepts-by-postulation and concepts-by-intuition -- 3. From social science concepts-by-intuition to assertions -- 4. The formulation of requests for an answer -- 5. Specific survey research features of requests for an answer -- 6. Response alternatives -- 7. The structure of open-ended and closed survey items -- 8. Survey items in batteries -- 9. Mode of data collection and other choices -- 10. Criteria for the quality of survey measures -- 11. Estimation of reliability, validity and method effects -- 12. Split-ballot multitrait-multimethod designs -- 13. MTMM experiments and the quality of survey questions -- 14. The SQP 2.0 program for prediction of quality and improvement of measurement -- 15. The quality of measures for concepts-by-postulation -- 16. Correction for measurement errors -- 17. Coping with measurement error in cross-cultural research
|
| 650 |
|
0 |
|a Interviewing
|
| 650 |
|
0 |
|a Questionnaires
|
| 650 |
|
0 |
|a Social surveys
|
| 650 |
|
0 |
|a Social surveys
|x Methodology
|
| 700 |
1 |
|
|a Gallhofer, Irmtraud N. ,
|e author
|
| 999 |
|
|
|a 1000161909
|b Book
|c OPEN SHELF (30 DAYS)
|e Gong Badak Campus
|