Location-based management for construction [ planning, scheduling and control

With case studies for illustration, this is a practitioner's guide to a different production system for construction management using flowline scheduling

Bibliographic Details
Main Authors: Kenley, Russell (Author), Seppeanen, Olli (Author)
Format: Book
Language:English
Published: London New York : Spon Press , c2010
Subjects:
Online Access:NetLibrary

MARC

LEADER 00000cam a2200000 7i4500
001 0000070523
005 20110504093000.0
008 110227s2010 enk eng
020 |a 0203030419 (electronic bk.) 
020 |a 9780203030417 (electronic bk.) 
020 |a 9780415370509 
050 0 0 |a TH438.4   |b .K46 2010 
090 0 0 |a TH438.4   |b .K46 2010 
100 1 |a Kenley, Russell ,   |e author 
245 1 0 |a Location-based management for construction [  |h electronic resource] :   |b planning, scheduling and control   |c Russell Kenley and Olli Seppeanen 
260 |a London   |a New York :   |b Spon Press ,   |c c2010 
300 |a 1 online resource (xxx, 554 p.) :   |b ill 
500 |a Description based on print version record 
504 |a Includes bibliographical references and indexes 
520 |a With case studies for illustration, this is a practitioner's guide to a different production system for construction management using flowline scheduling 
650 0 |a Building   |x Superintendence   |x Data processing 
650 0 |a Flowline 
650 0 |a Location-based services 
650 0 |a Production scheduling   |x Data processing 
650 4 |a Building 
650 4 |a Production scheduling 
700 1 |a Seppeanen, Olli ,   |e author 
856 4 0 |3 NetLibrary   |u http://www.netlibrary.com/urlapi.asp?action=summary&v=1&bookid=171344 
999 |a 1000137077   |b Electronic Resource   |c OPEN SHELF (30 DAYS)   |e Gong Badak Campus