|
|
|
|
| LEADER |
00000cam a2200000 7i4500 |
| 001 |
0000070523 |
| 005 |
20110504093000.0 |
| 008 |
110227s2010 enk eng |
| 020 |
|
|
|a 0203030419 (electronic bk.)
|
| 020 |
|
|
|a 9780203030417 (electronic bk.)
|
| 020 |
|
|
|a 9780415370509
|
| 050 |
0 |
0 |
|a TH438.4
|b .K46 2010
|
| 090 |
0 |
0 |
|a TH438.4
|b .K46 2010
|
| 100 |
1 |
|
|a Kenley, Russell ,
|e author
|
| 245 |
1 |
0 |
|a Location-based management for construction [
|h electronic resource] :
|b planning, scheduling and control
|c Russell Kenley and Olli Seppeanen
|
| 260 |
|
|
|a London
|a New York :
|b Spon Press ,
|c c2010
|
| 300 |
|
|
|a 1 online resource (xxx, 554 p.) :
|b ill
|
| 500 |
|
|
|a Description based on print version record
|
| 504 |
|
|
|a Includes bibliographical references and indexes
|
| 520 |
|
|
|a With case studies for illustration, this is a practitioner's guide to a different production system for construction management using flowline scheduling
|
| 650 |
|
0 |
|a Building
|x Superintendence
|x Data processing
|
| 650 |
|
0 |
|a Flowline
|
| 650 |
|
0 |
|a Location-based services
|
| 650 |
|
0 |
|a Production scheduling
|x Data processing
|
| 650 |
|
4 |
|a Building
|
| 650 |
|
4 |
|a Production scheduling
|
| 700 |
1 |
|
|a Seppeanen, Olli ,
|e author
|
| 856 |
4 |
0 |
|3 NetLibrary
|u http://www.netlibrary.com/urlapi.asp?action=summary&v=1&bookid=171344
|
| 999 |
|
|
|a 1000137077
|b Electronic Resource
|c OPEN SHELF (30 DAYS)
|e Gong Badak Campus
|