|
|
|
|
| LEADER |
00000cam a2200000 7i4500 |
| 001 |
0000029350 |
| 005 |
20021119.0 |
| 008 |
021119n |
| 020 |
|
|
|a 0442212801
|
| 090 |
0 |
0 |
|a HD47.3
|b .B44
|
| 100 |
0 |
|
|a Behan, Raymond J. ,
|e author
|
| 245 |
0 |
0 |
|a How to develop, install, and maintain a cost reduction
|c productivity improvement program/Raymond J Behan
|
| 260 |
2 |
|
|a New York :
|b Van Nostrand Reinhold ,
|c c1986
|
| 300 |
|
|
|a xi, 205 p. ; ;
|c 24 cm.
|
| 504 |
|
|
|a Includes index
|
| 650 |
|
0 |
|a Cost control
|
| 650 |
|
0 |
|a Industrial productivity
|
| 999 |
|
|
|a 1000049597
|b Book
|c OPEN SHELF (30 DAYS)
|e Gong Badak Campus
|
| 999 |
|
|
|a 1000072766
|b Book
|c OPEN SHELF (30 DAYS)
|e Gong Badak Campus
|