|
|
|
|
| LEADER |
00000cam a2200000 7i4500 |
| 001 |
0000014661 |
| 008 |
021119n |
| 020 |
|
|
|a 0930206053
|
| 090 |
0 |
0 |
|a TS181
|b .F6
|
| 100 |
0 |
|
|a Foster, Joseph W.
|e author
|
| 245 |
0 |
0 |
|a Reliability, availability and maintainability
|b the assurance technologies applied to the procurement of production systems
|c Joseph W. Foster, Don T. Phillips, Thomas R. Rogers
|
| 260 |
2 |
|
|a Beaverton, Ore.
|b M/A Press
|c 1981
|
| 300 |
|
|
|a 265 p. ;
|c 24 cm.
|
| 650 |
|
0 |
|a Manufacturing processes
|
| 700 |
0 |
|
|a Phillips, Don T.
|e author
|
| 700 |
0 |
|
|a Rogers, Thomas R.
|e author
|
| 999 |
|
|
|a 1000042349
|b Book
|c OPEN SHELF (30 DAYS)
|e Gong Badak Campus
|