|
|
|
|
| LEADER |
00000cam a2200000 7i4500 |
| 001 |
0000003794 |
| 008 |
021118n |
| 020 |
|
|
|a 0434918407
|
| 090 |
0 |
0 |
|a T56.8
|b .P764
|
| 245 |
0 |
0 |
|a Project cost control using networks
|c edited by C. Staffurth
|
| 250 |
|
|
|a 2nd ed.
|
| 260 |
2 |
|
|a London
|b Published in association with the Operational Research Society and The Institute of Cost and Management Accountants [by] Heinemann
|c 1980
|
| 300 |
|
|
|a 118 p. ;
|c 22 cm.
|
| 650 |
|
0 |
|a Industrial project management
|
| 650 |
|
0 |
|a Network analysis (Planning)
|
| 700 |
0 |
|
|a Staffurth, C.
|e author
|
| 710 |
0 |
0 |
|a Operational Research Society (Great Britain)
|
| 710 |
0 |
2 |
|a Institute of Cost and Management Accountants (Great Britain)
|
| 999 |
|
|
|a 1000037591
|b Book
|c OPEN SHELF (30 DAYS)
|e Gong Badak Campus
|