Search Results - "Mike

Refine Results
  1. 1

    Rainfall runoff simulation using MIKE11 NAM by Shamsudin, Supiah, Hashim, Normala

    Published 2002
    “…This study deals with Layang River rainfall runoff estimation using MIKE 11 NAM model. The calibration and validation procedures were carried out to provide a satisfactory estimation. …”
    Get full text
    Get full text
  2. 2

    ASSESSING MIKE-11 MODEL FOR BOD AND COD TRANSPORT IN BERTAM RIVER, CAMERON HIGHLANDS by Malakahmad, Dr, Amirhossein, Dr, Eisakhani, Mahdieh, Kutty, S.R.M., Isa, M.H.

    Published 2008
    “…The comparative analysis between measured and simulated data showed that MIKE-11 is able to predict sufficiently accurate BOD and COD loads at the catchment outlet. …”
    Get full text
    Get full text
  3. 3

    Developing MIKE-11 Model for Water Quality Simulation in Bertam River, Cameron Highlands by Malakahmad, Dr, Amirhossein, Dr, Eisakhani, Mahdieh, Isa, M.H.

    Published 2008
    “…Among them in some area the amount of E-coli was 61000 MPN/100 ml and very high. MIKE-11, a one-dimensional hydrodynamic simulation program was utilized to model stream flow and water quality processing in Bertam river. …”
    Get full text
    Get full text
  4. 4

    Developing MIKE-11 Model for Water Quality Simulation in Bertam River, Cameron Highlands by Malakahmad, Dr, Amirhossein, Dr, Eisakhani, Mahdieh, Isa, M.H.

    Published 2008
    “…Among them in some area the amount of E-coli was 61000 MPN/100 ml and very high. MIKE-11, a one-dimensional hydrodynamic simulation program was utilized to model stream flow and water quality processing in Bertam river. …”
    Get full text
    Get full text
  5. 5

    A study of the Cymbals by Mike Portnoy’s dance of eternity / Mohd Hasanul Abu Bakar by Abu Bakar, Mohd Hasanul

    Published 2019
    “…The core of this research is to explore the playing of cymbals on pieces Dance of Eternity by Mike Portnoy. In this analysis, the writer is focuses on Mike Portnoy in the piece that have element of progressive rock. …”
    Get full text
  6. 6

    Application Of Mike 11 Gis Model For Modeling Of Flood In Sungai Kayu Ara Catchment by Arbai, Sabariah

    Published 2002
    “…This result of the study shows that it is possible to use limited hydrological data to map the flash flood using MIKE 11 and MIKE 11 GIS. However, ground survey data with cross sectional intervals of 75 m to 100 m used in the study was found to be insufficient to provide adequately the elevation profile and further refinement is neccessary.…”
    Get full text
    Get full text
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11

    Waste assimilative capacity of coastal waters along Mumbai mega city, west coast of India using MIKE-21 and WASP simulation models by Vishnuradhan, Renjith, Vethamony, Ponnumony, Zainudin, Zaki, Vinod Kumar, Kumar

    Published 2014
    “…The pollution load (Biochemical Oxygen Demand) calculated using the Population Equivalent value of 0.225 m3/day for the present Mumbai population of 13 million is 731,250 kg/day. Simulations using MIKE-21 and WASP models along with the observed water quality data as well as current meter data indicated that the coastal waters can withstand the present pollution load since the simulated Biochemical Oxygen Demand was with in the range of 0.2-1.5 mg/L, the National Standard limits. …”
    Get full text
    Get full text
    Get full text
    Get full text
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20