Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor

Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis...

Full description

Bibliographic Details
Main Author: Suif, Zuliziana
Format: Thesis
Language:English
Published: 2008
Subjects:
Online Access:http://eprints.utm.my/9863/
http://eprints.utm.my/9863/1/ZulizianaSuifMFKM2008.pdf
_version_ 1848891958098919424
author Suif, Zuliziana
author_facet Suif, Zuliziana
author_sort Suif, Zuliziana
building UTeM Institutional Repository
collection Online Access
description Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis of detention pond overflow at Ledang Heights, Nusajaya, Johor Bahru. Monte Carlo simulation the simplest application to estimate the probability of occurrence of the 10 year rainfall interevent timeswas applied during this study. The maximum value for interevent time was 8 hr and 6 hr occurred with probability 24.18% and 28.39% after 5000 and 10000 trials respectively using Gamma distribution. The most likely range for interevent time were 2 to 18 hr (1.34%-1%) and 2 to 22 hr (3.84%-0.05%). The equation by Guo (2002) was applied during this study. The highest overflow risk obtained was 0.425 for the longest drain time of 71.75 minutes and for shortest elapse time. The overflow risk increases as the drain time increases and the elapse time decreases. Therefore, the selection of a proper drain time (recession time) is very important for reducing risk of overflow. Size of detention pond at the site is 70 m length x 70 m width x 3 m depth. The new size suggested was 82 m length x 70 m width x 3 m depth. The storage capacity of detention pond was larger than the volume of maximum rainfall data. The new size of detention pond is appropriate at the area because it could collect the maximum volume of runoff over a longer time period at the lowest overflow risk. It is suggested to design at lower elapse and drain time to minimize the overflow risk.
first_indexed 2025-11-15T21:06:14Z
format Thesis
id utm-9863
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T21:06:14Z
publishDate 2008
recordtype eprints
repository_type Digital Repository
spelling utm-98632018-07-25T08:06:30Z http://eprints.utm.my/9863/ Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor Suif, Zuliziana TA Engineering (General). Civil engineering (General) Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis of detention pond overflow at Ledang Heights, Nusajaya, Johor Bahru. Monte Carlo simulation the simplest application to estimate the probability of occurrence of the 10 year rainfall interevent timeswas applied during this study. The maximum value for interevent time was 8 hr and 6 hr occurred with probability 24.18% and 28.39% after 5000 and 10000 trials respectively using Gamma distribution. The most likely range for interevent time were 2 to 18 hr (1.34%-1%) and 2 to 22 hr (3.84%-0.05%). The equation by Guo (2002) was applied during this study. The highest overflow risk obtained was 0.425 for the longest drain time of 71.75 minutes and for shortest elapse time. The overflow risk increases as the drain time increases and the elapse time decreases. Therefore, the selection of a proper drain time (recession time) is very important for reducing risk of overflow. Size of detention pond at the site is 70 m length x 70 m width x 3 m depth. The new size suggested was 82 m length x 70 m width x 3 m depth. The storage capacity of detention pond was larger than the volume of maximum rainfall data. The new size of detention pond is appropriate at the area because it could collect the maximum volume of runoff over a longer time period at the lowest overflow risk. It is suggested to design at lower elapse and drain time to minimize the overflow risk. 2008-06 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/9863/1/ZulizianaSuifMFKM2008.pdf Suif, Zuliziana (2008) Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TA Engineering (General). Civil engineering (General)
Suif, Zuliziana
Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
title Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
title_full Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
title_fullStr Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
title_full_unstemmed Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
title_short Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
title_sort risk based analysis for detention pond overflow at iskandar malaysia (nusajaya), johor
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/9863/
http://eprints.utm.my/9863/1/ZulizianaSuifMFKM2008.pdf