Bed load transport from a regenerated forest catchment in Sarawak
This note presents preliminary results of a study on bed load transport from a 0.6 km2 forested catchment in Sarawak, Malaysia, once affected by logging activities. The influence of rainfall and stream discharge on bedload production was investigated. The estimated 6 months total bedload of the stud...
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Faculty of Civil Engineering, UTM
2005
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/8303/ http://eprints.utm.my/8303/1/ZulkifliYusop2005_BedLoadTransportFromARegerated.pdf |
| _version_ | 1848891661872005120 |
|---|---|
| author | Gerusu, Geoffery James Yusop, Zulkifli |
| author_facet | Gerusu, Geoffery James Yusop, Zulkifli |
| author_sort | Gerusu, Geoffery James |
| building | UTeM Institutional Repository |
| collection | Online Access |
| description | This note presents preliminary results of a study on bed load transport from a 0.6 km2 forested catchment in Sarawak, Malaysia, once affected by logging activities. The influence of rainfall and stream discharge on bedload production was investigated. The estimated 6 months total bedload of the study area was 0.54 tons or 0.18 t/ lcm2/month.
|
| first_indexed | 2025-11-15T21:01:31Z |
| format | Article |
| id | utm-8303 |
| institution | Universiti Teknologi Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T21:01:31Z |
| publishDate | 2005 |
| publisher | Faculty of Civil Engineering, UTM |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | utm-83032010-06-02T01:54:01Z http://eprints.utm.my/8303/ Bed load transport from a regenerated forest catchment in Sarawak Gerusu, Geoffery James Yusop, Zulkifli TA Engineering (General). Civil engineering (General) This note presents preliminary results of a study on bed load transport from a 0.6 km2 forested catchment in Sarawak, Malaysia, once affected by logging activities. The influence of rainfall and stream discharge on bedload production was investigated. The estimated 6 months total bedload of the study area was 0.54 tons or 0.18 t/ lcm2/month. Faculty of Civil Engineering, UTM 2005 Article PeerReviewed application/pdf en http://eprints.utm.my/8303/1/ZulkifliYusop2005_BedLoadTransportFromARegerated.pdf Gerusu, Geoffery James and Yusop, Zulkifli (2005) Bed load transport from a regenerated forest catchment in Sarawak. Jurnal Kejuruteraan Awam, 17 (2). pp. 69-72. ISSN 0128-0147 http://portal.psz.utm.my/psz/index.php?option=com_content&task=view&id=128&Itemid=305&PHPSESSID=81b664e998055f65b4ccff8f61bf7cb2 |
| spellingShingle | TA Engineering (General). Civil engineering (General) Gerusu, Geoffery James Yusop, Zulkifli Bed load transport from a regenerated forest catchment in Sarawak |
| title | Bed load transport from a regenerated forest catchment in Sarawak |
| title_full | Bed load transport from a regenerated forest catchment in Sarawak |
| title_fullStr | Bed load transport from a regenerated forest catchment in Sarawak |
| title_full_unstemmed | Bed load transport from a regenerated forest catchment in Sarawak |
| title_short | Bed load transport from a regenerated forest catchment in Sarawak |
| title_sort | bed load transport from a regenerated forest catchment in sarawak |
| topic | TA Engineering (General). Civil engineering (General) |
| url | http://eprints.utm.my/8303/ http://eprints.utm.my/8303/ http://eprints.utm.my/8303/1/ZulkifliYusop2005_BedLoadTransportFromARegerated.pdf |