A neural model for predicting the time performance of traditional general contract (TGC) project
Several studies had shown that many project managers are facing difficulties in predicting the time performance of Traditional General Contract (TGC) projects because there are many factors that affect TGC project success. This study presents the development of a model that can be used to predict th...
| Main Authors: | Mohamad Zin, Rosli, Tan, Caren Cai Loon |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Faculty of Civil Engineering, Universiti Teknologi Malaysia
2008
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/8188/ http://eprints.utm.my/8188/1/RosliMohamadZin2008-ANeuralNetworkModelforPredicting.pdf |
Similar Items
Predicting the performance of traditional general contract projects: A neural network based approach
by: Mohamad Zin, Rosli, et al.
Published: (2006)
by: Mohamad Zin, Rosli, et al.
Published: (2006)
Predicting the performance of design-bid-build projects: a neural-network based approach
by: Tan, Caren Cai Loon
Published: (2006)
by: Tan, Caren Cai Loon
Published: (2006)
Analisis of the process for traditional general contracting in Sarawak Malaysia
by: Tsen, S.F
Published: (2006)
by: Tsen, S.F
Published: (2006)
Analisis of the tender process for traditional general contracting in Sarawak Malaysia
by: Tsen, Soo Fui.
Published: (2006)
by: Tsen, Soo Fui.
Published: (2006)
The understanding of contract documentation in project implementation
by: Madon, Zulkifly
Published: (2005)
by: Madon, Zulkifly
Published: (2005)
Exploitation of contract document for construction project planning and controlling
by: Ali, Aminudin
Published: (2006)
by: Ali, Aminudin
Published: (2006)
Influence of technical challenges on construction project contracting
by: Coleman, Charles Egyabeng, et al.
Published: (2025)
by: Coleman, Charles Egyabeng, et al.
Published: (2025)
The Influence Of Project Documents On The Outcome Of
Construction Projects Procured By Traditional Contracts In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Prediction of classroom reverberation time using neural network
by: Zainudin, Fathin Liyana, et al.
Published: (2018)
by: Zainudin, Fathin Liyana, et al.
Published: (2018)
Knowledge transferring process in earthwork contracting firms
by: Mansur, Shaiful Amri, et al.
Published: (2008)
by: Mansur, Shaiful Amri, et al.
Published: (2008)
Analysis on the problems faced by contractors implementing traditional and design & build contract in Malaysia
by: Norziatul Husna, Mohd Ridzuan
Published: (2012)
by: Norziatul Husna, Mohd Ridzuan
Published: (2012)
Construction and demolition waste recycling and reuse clause in standard form contracts: impact on project performance
by: Nurhaizan, Mohd Zainudin, et al.
Published: (2023)
by: Nurhaizan, Mohd Zainudin, et al.
Published: (2023)
Investigation of the EMG-Time Relationship of the Biceps Brachii Muscle During Contractions
by: Ahamed, Nizam Uddin, et al.
Published: (2015)
by: Ahamed, Nizam Uddin, et al.
Published: (2015)
Food intake calorie prediction using generalized regression neural network
by: Gunawan, Teddy Surya, et al.
Published: (2019)
by: Gunawan, Teddy Surya, et al.
Published: (2019)
Developing a model to predict time delay in road construction projects using bayesian networks
by: Mohammad, Almohammad
Published: (2020)
by: Mohammad, Almohammad
Published: (2020)
Theoretical Insights into Neural Networks and Deep Learning: Advancing Understanding, Interpretability, and Generalization
by: Usmani, Usman Ahmad, et al.
Published: (2023)
by: Usmani, Usman Ahmad, et al.
Published: (2023)
The Application of the Water Erosion Prediction Project (WEPP)
Model for the Estimation of Runoff and Sediment on a Monthly Time Resolution
by: Akbari, Abolghasem, et al.
Published: (2015)
by: Akbari, Abolghasem, et al.
Published: (2015)
A Balanced Approach to Project Management in Partnering Types of Contract: A Public Private Partnerships Framework
by: Mandiartha, Putu, et al.
Published: (2016)
by: Mandiartha, Putu, et al.
Published: (2016)
Implementation of generalized predictive control (GPC) for a real-time process control using labview
by: Mohd. Faudzi, Ahmad 'Athif
Published: (2006)
by: Mohd. Faudzi, Ahmad 'Athif
Published: (2006)
The Application of the Water Erosion Prediction Project (WEPP) Model for the Estimation of Runoff and Sediment on a Monthly Time Resolution
by: Abolghasem, Akbari, et al.
Published: (2015)
by: Abolghasem, Akbari, et al.
Published: (2015)
Understanding contract documentation
by: Mohamad, Mohamad Ibrahim, et al.
Published: (2006)
by: Mohamad, Mohamad Ibrahim, et al.
Published: (2006)
Relation Between EMG Signal Activation and Time Lags Using Feature Analysis During Dynamic Contraction
by: Ahamed, Nizam Uddin, et al.
Published: (2015)
by: Ahamed, Nizam Uddin, et al.
Published: (2015)
The neural mechanisms of general anesthesia
by: Zarith Fadila, Jamel
Published: (2009)
by: Zarith Fadila, Jamel
Published: (2009)
Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method
by: Muhamad Afiq, Mustafa
Published: (2015)
by: Muhamad Afiq, Mustafa
Published: (2015)
Prediction of flood event by using artificial neural network at Padas River
by: Amir Aliff, Amri
Published: (2015)
by: Amir Aliff, Amri
Published: (2015)
Neural Network Model For Design Constructability Assessment
by: Mohamad Zin, Rosli, et al.
Published: (2004)
by: Mohamad Zin, Rosli, et al.
Published: (2004)
Joint Contract-Function Effects on BIM-Enabled EPC Project Performance
by: Lee, C.Y., et al.
Published: (2020)
by: Lee, C.Y., et al.
Published: (2020)
New Engineering Contract (NEC) 1993 as radical changes to the Malaysian standard forms of contract
by: Chan, Melissa Yuet Li
Published: (2006)
by: Chan, Melissa Yuet Li
Published: (2006)
Evaluation on PWD 75, standard form of general conditions of contract in Sarawak
by: Sia, Pik Soon
Published: (2008)
by: Sia, Pik Soon
Published: (2008)
Principles of implied terms in construction contracts
by: Lee, Cen Ying
Published: (2007)
by: Lee, Cen Ying
Published: (2007)
Developing the prediction model for mitigating the abandoned housing projects in malaysia
by: Saidah An’nisaa, Salam
Published: (2023)
by: Saidah An’nisaa, Salam
Published: (2023)
Time Series Prediction Using Recurrent Neural Networks And Boosting: An Experimental Study In Pharmaceutical Product Formulation
by: Goh, Wei Yee
Published: (2002)
by: Goh, Wei Yee
Published: (2002)
Prediction on the mechanical strength of coal ash concrete using artificial neural network
by: Muhammad Nor Syahrul, Zaimi, et al.
Published: (2022)
by: Muhammad Nor Syahrul, Zaimi, et al.
Published: (2022)
Prediction of the displacement mechanism of the cracked soil using NXFEM and Artificial Neural Networks
by: Namdar, Abdoullah, et al.
Published: (2023)
by: Namdar, Abdoullah, et al.
Published: (2023)
The effect to the termination of letter of intent in construction contract
by: Mohamed Saad, Mohamad Zaidi
Published: (2007)
by: Mohamed Saad, Mohamad Zaidi
Published: (2007)
Artificial Neural Network Model Prediction of Glucose by Enzymatic Hydrolysis of Rice Straw
by: Jaya, Erniza Mohd Johan, et al.
Published: (2014)
by: Jaya, Erniza Mohd Johan, et al.
Published: (2014)
Prostate cancer prediction using feedforward neural network trained with particle swarm optimizer
by: Jui, Julakha Jahan, et al.
Published: (2022)
by: Jui, Julakha Jahan, et al.
Published: (2022)
Prediction of abrasive waterjet machining of sheet metals using artificial neural network
by: Nur Khadijah, Mazlan, et al.
Published: (2022)
by: Nur Khadijah, Mazlan, et al.
Published: (2022)
Prediction of abrasive waterjet machining of sheet metals using artificial neural network
by: Nur Khadijah, Mazlan, et al.
Published: (2022)
by: Nur Khadijah, Mazlan, et al.
Published: (2022)
Artificial neural network model for predicting wet scrubber performance
by: Danzomo, Bashir Ahmed, et al.
Published: (2012)
by: Danzomo, Bashir Ahmed, et al.
Published: (2012)
Similar Items
-
Predicting the performance of traditional general contract projects: A neural network based approach
by: Mohamad Zin, Rosli, et al.
Published: (2006) -
Predicting the performance of design-bid-build projects: a neural-network based approach
by: Tan, Caren Cai Loon
Published: (2006) -
Analisis of the process for traditional general contracting in Sarawak Malaysia
by: Tsen, S.F
Published: (2006) -
Analisis of the tender process for traditional general contracting in Sarawak Malaysia
by: Tsen, Soo Fui.
Published: (2006) -
The understanding of contract documentation in project implementation
by: Madon, Zulkifly
Published: (2005)