APA (7th ed.) Citation

Mohamad Zin, R., & Tan, C. C. L. (2008). A neural model for predicting the time performance of traditional general contract (TGC) project. Faculty of Civil Engineering, Universiti Teknologi Malaysia.

Chicago Style (17th ed.) Citation

Mohamad Zin, Rosli, and Caren Cai Loon Tan. A Neural Model for Predicting the Time Performance of Traditional General Contract (TGC) Project. Faculty of Civil Engineering, Universiti Teknologi Malaysia, 2008.

MLA (9th ed.) Citation

Mohamad Zin, Rosli, and Caren Cai Loon Tan. A Neural Model for Predicting the Time Performance of Traditional General Contract (TGC) Project. Faculty of Civil Engineering, Universiti Teknologi Malaysia, 2008.

Warning: These citations may not always be 100% accurate.