A systematic approach for monitoring and evaluating the construction project progress
A persistent problem in construction is to document changes which occur in the field and to prepare the as-built schedule. In current practice, deviations from planned performance can only be reported after significant time has elapsed and manual monitoring of the construction activities are costly...
| Main Authors: | Memon, Zubair Ahmed, Abd. Majid, Muhd. Zaimi, Mustaffar, Mushairry |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
The Institution of Engineers, Malaysia
2006
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/8056/ http://eprints.utm.my/8056/1/8056.pdf |
Similar Items
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007)
by: Ahmed Memon, Zubair, et al.
Published: (2007)
Systematic approach for developing as-built schedule for
construction project
by: Zubair Ahmed Memon,, et al.
Published: (2006)
by: Zubair Ahmed Memon,, et al.
Published: (2006)
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
An approach to joint roughness measurement in Rock-A comparative study
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)
Automated pavement imaging program (APIP) for pavement cracks classification and quantification – a photogrammetric approach
by: Mustaffar, Mushairry, et al.
Published: (2008)
by: Mustaffar, Mushairry, et al.
Published: (2008)
Strategies to measure progress and productivity in model-based construction projects
by: Ahmad Atif, Adzman
Published: (2019)
by: Ahmad Atif, Adzman
Published: (2019)
An adaptive cyber-physical system’s approach to construction progress monitoring and control
by: Olatunji, Oluwole, et al.
Published: (2014)
by: Olatunji, Oluwole, et al.
Published: (2014)
An effectiveness of communication in project undertaking: problems and constraints
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
A groupware system in monitoring construction project planning approval
by: Goh, Kai Chen
Published: (2006)
by: Goh, Kai Chen
Published: (2006)
A study on the application of location-based management and automated progress monitoring for linear infrastructure projects
by: Behnam Manesh, Ali
Published: (2016)
by: Behnam Manesh, Ali
Published: (2016)
Automated pavement imaging program (APIP) for pavement cracks classification and quantification
by: Che Puan, Othman, et al.
Published: (2007)
by: Che Puan, Othman, et al.
Published: (2007)
Application of digital photogrammetry to quantification of road surface distresses
by: Mustaffar, Mushairry, et al.
Published: (2004)
by: Mustaffar, Mushairry, et al.
Published: (2004)
Investigating the feasibility of photogrammetric area-based image matching technique in the measurement of three-dimensional deflections of structures
by: Mustaffar, Mushairry, et al.
Published: (2005)
by: Mustaffar, Mushairry, et al.
Published: (2005)
Progress monitoring system for student final year project
by: Siti Nurhidayah, Mohamad Khazali
Published: (2013)
by: Siti Nurhidayah, Mohamad Khazali
Published: (2013)
Neural Network Model For Design Constructability Assessment
by: Mohamad Zin, Rosli, et al.
Published: (2004)
by: Mohamad Zin, Rosli, et al.
Published: (2004)
Modal Analysis Of High Frequency Acoustic Signal Approach For Progressive Failure Monitoring In Thin Composite Plates
by: Z. M., Hafizi, et al.
Published: (2012)
by: Z. M., Hafizi, et al.
Published: (2012)
Public monitoring of environmental management plan implementation in road construction projects: key performance indicators
by: Nurol Huda, Dahalan, et al.
Published: (2023)
by: Nurol Huda, Dahalan, et al.
Published: (2023)
A hierarchical approach to the management of construction project risk
by: Dawson, Peter James
Published: (1997)
by: Dawson, Peter James
Published: (1997)
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
by: Ijaz, Ahmad, et al.
Published: (2024)
by: Ijaz, Ahmad, et al.
Published: (2024)
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
Public monitoring of environmental management plan implementation in road construction projects : Key performance indicators
by: Nurol Huda, Dahalan, et al.
Published: (2023)
by: Nurol Huda, Dahalan, et al.
Published: (2023)
Engineering doctorate (EngD) programme at Universiti Teknologi Malaysia
by: Abd. Majid, Muhd. Zaimi, et al.
Published: (2004)
by: Abd. Majid, Muhd. Zaimi, et al.
Published: (2004)
Techniques to develop forecasting model on low cost housing in urban area
by: Zainun, Noor Yasmin, et al.
Published: (2002)
by: Zainun, Noor Yasmin, et al.
Published: (2002)
Implementation of project monitoring and controlling in construction in Pahang
by: Ahmad Al Asfahan, Abdull Rahim
Published: (2015)
by: Ahmad Al Asfahan, Abdull Rahim
Published: (2015)
Systematic approach and strategies for building information modelling (BIM) adoption in the Jordanian construction industry
by: Al-Diabat Al-Btoush, Mohammad
Published: (2018)
by: Al-Diabat Al-Btoush, Mohammad
Published: (2018)
Analytic hierarchy progress (AHP) for construction technologies adoption in the Malaysian Construction Industry
by: Chai, Changsaar, et al.
Published: (2025)
by: Chai, Changsaar, et al.
Published: (2025)
Performance indicators for public evaluation of environmental management plan implementation in highway construction projects
by: Nurol Huda, Dahalan, et al.
Published: (2023)
by: Nurol Huda, Dahalan, et al.
Published: (2023)
Causes of accidents at construction sites
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
An integrated approach for progress tracking in liquefied natural gas construction
by: Wang, J., et al.
Published: (2015)
by: Wang, J., et al.
Published: (2015)
BIM in Kenyan construction industry: Benefits, challenges, and adoption processes in sustainable construction projects
by: Alakhali, Ahmed K., et al.
Published: (2024)
by: Alakhali, Ahmed K., et al.
Published: (2024)
Case on Integrated Time and Cost Monitoring of Construction Projects
by: M., Waris, et al.
Published: (2017)
by: M., Waris, et al.
Published: (2017)
Structural modelling of cost overrun factors in construction industry
by: Memon, Aftab Hameed
Published: (2013)
by: Memon, Aftab Hameed
Published: (2013)
Scaffolding progress monitoring of LNG plant maintenance project using BIM and image processing technologies
by: Chi, Hung-Lin, et al.
Published: (2017)
by: Chi, Hung-Lin, et al.
Published: (2017)
Study of deserted construction projects in Malaysia
by: Nazratul Izzana, Ishak
Published: (2015)
by: Nazratul Izzana, Ishak
Published: (2015)
Using factor analysis to assess the key factors influencing the success completion of a public school project in Malaysia
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
Modeling the construction readiness parameters for abandoned housing projects in Malaysia: PLS-SEM approach
by: N. Aishah, Abdul-Rahman, et al.
Published: (2024)
by: N. Aishah, Abdul-Rahman, et al.
Published: (2024)
Modeling workplace well-being factors in infrastructure construction projects: PLS-SEM approach
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
Construction readiness parameters for highway projects
by: A. R., Radzi, et al.
Published: (2019)
by: A. R., Radzi, et al.
Published: (2019)
Contractual challenges for BIM-based construction projects: a systematic review
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2018)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2018)
Similar Items
-
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007) -
Systematic approach for developing as-built schedule for
construction project
by: Zubair Ahmed Memon,, et al.
Published: (2006) -
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
An approach to joint roughness measurement in Rock-A comparative study
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)