A systematic procedure for developing the 3D model to evaluate the construction project progress
This main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM) system by integrating 3DAutoCAD drawings and digital images. The objective of this paper is to propose a framework model...
| Main Authors: | Ahmed Memon, Zubair, Abd. Majid, Muhd. Zaimi, Mustaffar, Mushairry |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Emerald Group Publishing Limited
2007
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/7973/ http://eprints.utm.my/7973/1/journals.htm_issn%3D1471-4175%26volume%3D7%26issue%3D2%26articleid%3D1602590%26show%3Dpdf |
Similar Items
A systematic approach for monitoring and evaluating the construction project progress
by: Memon, Zubair Ahmed, et al.
Published: (2006)
by: Memon, Zubair Ahmed, et al.
Published: (2006)
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
Systematic approach for developing as-built schedule for
construction project
by: Zubair Ahmed Memon,, et al.
Published: (2006)
by: Zubair Ahmed Memon,, et al.
Published: (2006)
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
Causes of accidents at construction sites
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
Hydrological and hydraulic study of water management system study for PT Bhumireksa Nusasejati, Sumatera, Indonesia
by: Mustaffar, Mushairry, et al.
Published: (2006)
by: Mustaffar, Mushairry, et al.
Published: (2006)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Using factor analysis to assess the key factors influencing the success completion of a public school project in Malaysia
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
The Impact of Material Management on Construction Project Delivery in Maldives
by: Zaha, Ahmed
Published: (2017)
by: Zaha, Ahmed
Published: (2017)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
Post-evaluation System In Construction Projects In Gaza
Strip-palestine
by: Enshassi, Adnan Ali, et al.
Published: (2014)
by: Enshassi, Adnan Ali, et al.
Published: (2014)
Evaluating the causes and effects of construction disputes in private sector projects
by: Lim, Kelly Kah Yee
Published: (2024)
by: Lim, Kelly Kah Yee
Published: (2024)
An effectiveness of communication in project undertaking: problems and constraints
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
Managing construction of telecommunication tower projects in Celcom
by: Pison, Zirwatul Hana
Published: (2007)
by: Pison, Zirwatul Hana
Published: (2007)
The Significant Risks In Small Scale Construction Projects
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Application of drone in visual inspection for construction project
by: Adam Zakwan, Zainuddin
Published: (2015)
by: Adam Zakwan, Zainuddin
Published: (2015)
Causes and effects of poor communication in construction projects
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
Quality and Quality Standards In Construction: A Systematic Review
by: Nurhidayah, Azmy, et al.
Published: (2021)
by: Nurhidayah, Azmy, et al.
Published: (2021)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
Influential factors affecting materials management in construction projects
by: Mat Jusoh, Zairra, et al.
Published: (2017)
by: Mat Jusoh, Zairra, et al.
Published: (2017)
Causes of low-skilled workers’ performance in construction projects
by: Alhaji Ali, Zannah, et al.
Published: (2017)
by: Alhaji Ali, Zannah, et al.
Published: (2017)
Examining unethical professional practices in construction projects in Malaysia
by: Tan, Ke Ling
Published: (2021)
by: Tan, Ke Ling
Published: (2021)
Acceptability of Malaysian construction practitioners in adopting 4D
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
An Investigation On The Awareness Of Sustainability Concept In Construction Projects: A Case Of Nigerian Students In The Construction Field.
by: Hadiza, Lawal Mayere
Published: (2016)
by: Hadiza, Lawal Mayere
Published: (2016)
Factors Affecting the Selection of the Procurement Methods for Construction Projects in Malaysia
by: Yap, Zhi Shan, et al.
Published: (2019)
by: Yap, Zhi Shan, et al.
Published: (2019)
Partnering between main contractors and sub-contractors in construction projects
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Assessment of Environmental Risks in Construction Projects: A Case of Malaysia
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Composition and Characteristics of Construction Waste
Generated by Residential Housing Project
by: Lau, H.H, et al.
Published: (2008)
by: Lau, H.H, et al.
Published: (2008)
Project communication aspects on construction performance: Investigating contractors’ perspective
by: Yu, Chooi Yi
Published: (2022)
by: Yu, Chooi Yi
Published: (2022)
Readiness of digital technology adoption in the Malaysian construction project management
by: Ong, Jiun Ren
Published: (2020)
by: Ong, Jiun Ren
Published: (2020)
The acceptability of four dimension (4D) virtual construction in Malaysia
by: Ali, Maisarah, et al.
Published: (2011)
by: Ali, Maisarah, et al.
Published: (2011)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
A Study on Quality Management System (QMS) Applied in Construction Project
by: Thong, Mei Poh
Published: (2016)
by: Thong, Mei Poh
Published: (2016)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Similar Items
-
A systematic approach for monitoring and evaluating the construction project progress
by: Memon, Zubair Ahmed, et al.
Published: (2006) -
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
Systematic approach for developing as-built schedule for
construction project
by: Zubair Ahmed Memon,, et al.
Published: (2006) -
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)