A systematic procedure for developing the 3D model to evaluate the construction project progress
This main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM) system by integrating 3DAutoCAD drawings and digital images. The objective of this paper is to propose a framework model...
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Emerald Group Publishing Limited
2007
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/7973/ http://eprints.utm.my/7973/1/journals.htm_issn%3D1471-4175%26volume%3D7%26issue%3D2%26articleid%3D1602590%26show%3Dpdf |
| _version_ | 1848891589051547648 |
|---|---|
| author | Ahmed Memon, Zubair Abd. Majid, Muhd. Zaimi Mustaffar, Mushairry |
| author_facet | Ahmed Memon, Zubair Abd. Majid, Muhd. Zaimi Mustaffar, Mushairry |
| author_sort | Ahmed Memon, Zubair |
| building | UTeM Institutional Repository |
| collection | Online Access |
| description | This main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM) system by integrating 3DAutoCAD drawings and digital images. The objective of this paper is to propose a framework model for the DCM system and discuss in detail the steps involved for developing and calculating the 3D coordinate values from 2D digital images. |
| first_indexed | 2025-11-15T21:00:22Z |
| format | Article |
| id | utm-7973 |
| institution | Universiti Teknologi Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T21:00:22Z |
| publishDate | 2007 |
| publisher | Emerald Group Publishing Limited |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | utm-79732017-02-15T00:20:12Z http://eprints.utm.my/7973/ A systematic procedure for developing the 3D model to evaluate the construction project progress Ahmed Memon, Zubair Abd. Majid, Muhd. Zaimi Mustaffar, Mushairry TH Building construction This main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM) system by integrating 3DAutoCAD drawings and digital images. The objective of this paper is to propose a framework model for the DCM system and discuss in detail the steps involved for developing and calculating the 3D coordinate values from 2D digital images. Emerald Group Publishing Limited 2007 Article PeerReviewed text/html en http://eprints.utm.my/7973/1/journals.htm_issn%3D1471-4175%26volume%3D7%26issue%3D2%26articleid%3D1602590%26show%3Dpdf Ahmed Memon, Zubair and Abd. Majid, Muhd. Zaimi and Mustaffar, Mushairry (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation: Information, Process, Management, 7 (2). pp. 187-199. ISSN 1471-4175 DOI:10.1108/14714170710738540 |
| spellingShingle | TH Building construction Ahmed Memon, Zubair Abd. Majid, Muhd. Zaimi Mustaffar, Mushairry A systematic procedure for developing the 3D model to evaluate the construction project progress |
| title | A systematic procedure for developing the 3D model to evaluate the construction project progress
|
| title_full | A systematic procedure for developing the 3D model to evaluate the construction project progress
|
| title_fullStr | A systematic procedure for developing the 3D model to evaluate the construction project progress
|
| title_full_unstemmed | A systematic procedure for developing the 3D model to evaluate the construction project progress
|
| title_short | A systematic procedure for developing the 3D model to evaluate the construction project progress
|
| title_sort | systematic procedure for developing the 3d model to evaluate the construction project progress |
| topic | TH Building construction |
| url | http://eprints.utm.my/7973/ http://eprints.utm.my/7973/ http://eprints.utm.my/7973/1/journals.htm_issn%3D1471-4175%26volume%3D7%26issue%3D2%26articleid%3D1602590%26show%3Dpdf |