Rainfall runoff simulation using MIKE11 NAM

Rainfall runoff estimation from a watershed is of vital importance as these values are required in most hydrologic analysis for the purpose of water resources planning. This study deals with Layang River rainfall runoff estimation using MIKE 11 NAM model. The calibration and validation procedures we...

Full description

Bibliographic Details
Main Authors: Shamsudin, Supiah, Hashim, Normala
Format: Article
Language:English
Published: Faculty of Cvil Engineering 2002
Subjects:
Online Access:http://eprints.utm.my/7042/
http://eprints.utm.my/7042/1/SupiahShamsudin2002_RainfallRunoffSimulationUsing.pdf
_version_ 1848891394949644288
author Shamsudin, Supiah
Hashim, Normala
author_facet Shamsudin, Supiah
Hashim, Normala
author_sort Shamsudin, Supiah
building UTeM Institutional Repository
collection Online Access
description Rainfall runoff estimation from a watershed is of vital importance as these values are required in most hydrologic analysis for the purpose of water resources planning. This study deals with Layang River rainfall runoff estimation using MIKE 11 NAM model. The calibration and validation procedures were carried out to provide a satisfactory estimation. The runoff discharges were simulated for a 12-year period (1988-2000). The simulated peak flow occurred in 1992 and 1995 with approximate values of 20.94 m3/s and 18.93 m3/s respectively. The optimum values of the model parameters obtained during the calibration procedure were presented. The reliability of MIKE11 NAM was evaluated based on the Efficiency Index (EI) and Root Mean Square Error (RMSE). The EI and RMSE obtained during this study are 0.75 and 0.08 respectively
first_indexed 2025-11-15T20:57:17Z
format Article
id utm-7042
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:57:17Z
publishDate 2002
publisher Faculty of Cvil Engineering
recordtype eprints
repository_type Digital Repository
spelling utm-70422012-08-14T04:52:16Z http://eprints.utm.my/7042/ Rainfall runoff simulation using MIKE11 NAM Shamsudin, Supiah Hashim, Normala TA Engineering (General). Civil engineering (General) Rainfall runoff estimation from a watershed is of vital importance as these values are required in most hydrologic analysis for the purpose of water resources planning. This study deals with Layang River rainfall runoff estimation using MIKE 11 NAM model. The calibration and validation procedures were carried out to provide a satisfactory estimation. The runoff discharges were simulated for a 12-year period (1988-2000). The simulated peak flow occurred in 1992 and 1995 with approximate values of 20.94 m3/s and 18.93 m3/s respectively. The optimum values of the model parameters obtained during the calibration procedure were presented. The reliability of MIKE11 NAM was evaluated based on the Efficiency Index (EI) and Root Mean Square Error (RMSE). The EI and RMSE obtained during this study are 0.75 and 0.08 respectively Faculty of Cvil Engineering 2002 Article PeerReviewed application/pdf en http://eprints.utm.my/7042/1/SupiahShamsudin2002_RainfallRunoffSimulationUsing.pdf Shamsudin, Supiah and Hashim, Normala (2002) Rainfall runoff simulation using MIKE11 NAM. Jurnal Kejuruteraan Awam, 15 (2). pp. 26-38. ISSN 0128-0147
spellingShingle TA Engineering (General). Civil engineering (General)
Shamsudin, Supiah
Hashim, Normala
Rainfall runoff simulation using MIKE11 NAM
title Rainfall runoff simulation using MIKE11 NAM
title_full Rainfall runoff simulation using MIKE11 NAM
title_fullStr Rainfall runoff simulation using MIKE11 NAM
title_full_unstemmed Rainfall runoff simulation using MIKE11 NAM
title_short Rainfall runoff simulation using MIKE11 NAM
title_sort rainfall runoff simulation using mike11 nam
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/7042/
http://eprints.utm.my/7042/1/SupiahShamsudin2002_RainfallRunoffSimulationUsing.pdf